Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsNAICS | 324121 | Asphalt Paving Mixture and Block Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0605 # 06 Y:2023 | 06 | 2023 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $5,654 | $20,000 | Implemented |
UF0605 # 05 Y:2023 | 05 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $1,444,605 | $0 | Implemented |
UF0605 # 04 Y:2023 | 04 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,043 | $2,800 | Implemented |
UF0605 # 03 Y:2023 | 03 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,825 | $11,200 | Implemented |
UF0605 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $38,052 | $10,000 | Implemented |
UF0605 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $108,422 | $322,608 | Not Implemented |
MI0249 # 06 Y:2013 | 06 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,451 | $347 | Implemented |
MI0249 # 01 Y:2013 | 01 | 2013 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $1,845,922 | $2,000,000 | Implemented |
MI0249 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $38,483 | $20,790 | Not Implemented |
MI0249 # 03 Y:2013 | 03 | 2013 | INCREASE EFFICIENCY OF TRUCKS | $14,224 | $11,600 | Implemented |
MI0249 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,076 | $13,090 | Not Implemented |
MI0249 # 05 Y:2013 | 05 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,223 | $2,520 | Implemented |
MI0249 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,546 | $1,660 | Implemented |
MI0249 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,904 | $80 | Implemented |
MI0249 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $329 | $1,104 | Not Implemented |
MI0247 # 08 Y:2013 | 08 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $870 | $347 | Implemented |
MI0247 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,108 | $80 | Not Implemented |
MI0247 # 06 Y:2013 | 06 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,908 | $2,520 | Implemented |
MI0247 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,525 | $1,660 | Implemented |
MI0247 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,027 | $8,010 | Implemented |
MI0247 # 02 Y:2013 | 02 | 2013 | INSULATE BARE EQUIPMENT | $118,483 | $20,790 | Not Implemented |
MI0247 # 01 Y:2013 | 01 | 2013 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $630,378 | $1,000,000 | Not Implemented |
MI0247 # 03 Y:2013 | 03 | 2013 | INCREASE EFFICIENCY OF TRUCKS | $7,110 | $5,800 | Not Implemented |
MI0120 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,982 | $56 | Not Implemented |
MI0120 # 04 Y:2006 | 04 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,956 | $5,024 | Not Implemented |