IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

38

matching recommendations
Reset
NAICS 32419 Other Petroleum and Coal Products Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2405 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $44,207 $25,301 Implemented
LS2405 # 05 Y:2024 05 2024 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $155,225 $550,000 Implemented
LS2405 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,417 $135 Implemented
LS2405 # 01 Y:2024 01 2024 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $3,278 $0 Implemented
LS2405 # 06 Y:2024 06 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $129,015 $600,000 Not Implemented
LS2405 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,023 $50 Not Implemented
LL0275 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $121 $70 Implemented
LL0275 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $386 $200 Not Implemented
LL0275 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $523 $507 Not Implemented
LL0275 # 05 Y:2007 05 2007 USE PHOTOCELL CONTROLS $1,014 $90 Not Implemented
LL0275 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,791 $690 Implemented
LL0275 # 03 Y:2007 03 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,372 $240 Implemented
LL0275 # 02 Y:2007 02 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,002 $750 Implemented
LL0275 # 01 Y:2007 01 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $9,761 $500 Not Implemented
LL0253 # 01 Y:2006 01 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $4,994,000 $250,000 Not Implemented
LL0253 # 03 Y:2006 03 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $177,541 $24,000 Not Implemented
LL0253 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $120,278 $11,880 Not Implemented
LL0253 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,598 $8,750 Not Implemented
LL0253 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $67,882 $10,319 Not Implemented
LL0253 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $169,857 $39,760 Implemented
LL0253 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $658,473 $14,120 Implemented
LL0172 # 08 Y:2003 08 2003 USE PHOTOCELL CONTROLS $3,809 $1,176 Not Implemented
LL0172 # 07 Y:2003 07 2003 INSULATE BARE EQUIPMENT $5,380 $682 Not Implemented
LL0172 # 06 Y:2003 06 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,972 $5,600 Implemented
LL0172 # 05 Y:2003 05 2003 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $65,820 $312,701 Not Implemented