IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,567

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0442 # 05 Y:2014 05 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $231 $1,559 Implemented
SF0442 # 06 Y:2014 06 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $14,162 $173,094 Not Implemented
DL0118 # 01 Y:2013 01 2013 INSULATE BARE EQUIPMENT $13,600 $800 Not Implemented
DL0118 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,600 $16,500 Not Implemented
DL0118 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,500 $349,314 Implemented
DL0118 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,300 $3,000 Implemented
DL0118 # 05 Y:2013 05 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,900 $300 Not Implemented
DL0118 # 06 Y:2013 06 2013 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,500 $0 Implemented
DL0118 # 07 Y:2013 07 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $4,362 $4,680 Not Implemented
DL0118 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $2,400 $330 Not Implemented
DL0118 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,504 $20,000 Implemented
DL0118 # 10 Y:2013 10 2013 INSTALL OCCUPANCY SENSORS $3,600 $1,000 Implemented
DL0118 # 11 Y:2013 11 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,300 $700 Not Implemented
MI0253 # 01 Y:2013 01 2013 UTILIZE A LESS EXPENSIVE COOLING METHOD $174,761 $506,800 Not Implemented
MI0253 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $53,448 $80 Implemented
MI0253 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,154 $52,122 Implemented
MI0253 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $36,919 $2,300 Not Implemented
MI0253 # 05 Y:2013 05 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $22,448 $1,680 Implemented
MI0253 # 06 Y:2013 06 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,676 $1,660 Implemented
MI0253 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,885 $4,840 Not Implemented
MI0253 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,576 $80 Implemented
MI0252 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,914 $44,016 Not Implemented
MI0252 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,567 $80 Implemented
MI0252 # 03 Y:2013 03 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,770 $5,739 Not Implemented
MI0252 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,776 $7,350 Implemented