IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,567

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0246 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,190 $2,520 Not Implemented
MI0246 # 06 Y:2013 06 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,076 $6,910 Not Implemented
MI0246 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,508 $4,420 Implemented
MI0246 # 08 Y:2013 08 2013 PAY BILLS ON TIME TO AVOID LATE FEES $945 $240 Implemented
MI0246 # 09 Y:2013 09 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $876 $80 Implemented
UD0887 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,553 $50 Implemented
UD0887 # 02 Y:2013 02 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,438 $0 Implemented
UD0887 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $497 $500 Implemented
UD0887 # 04 Y:2013 04 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $8,763 $2,075 Implemented
UD0887 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $3,141 $350 Not Implemented
UD0887 # 06 Y:2013 06 2013 ADD AREA LIGHTING SWITCHES $594 $350 Implemented
UD0887 # 07 Y:2013 07 2013 OPTIMIZE PLANT POWER FACTOR $19,173 $10,000 Not Implemented
UD0887 # 08 Y:2013 08 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,244 $0 Not Implemented
UD0887 # 09 Y:2013 09 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,136 $4,000 Not Implemented
UD0887 # 10 Y:2013 10 2013 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $187 $300 Not Implemented
UD0887 # 11 Y:2013 11 2013 DEVELOP A REPAIR/REPLACE POLICY $2,637 $3,420 Implemented
UD0887 # 12 Y:2013 12 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $500 $0 Not Implemented
UD0887 # 13 Y:2013 13 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $383 $0 Implemented
OR0611 # 01 Y:2013 01 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,437 $0 Not Implemented
OR0611 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $8,684 $5,600 Not Implemented
OR0611 # 03 Y:2013 03 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,909 $37,830 Not Implemented
OR0611 # 04 Y:2013 04 2013 UPGRADE OBSOLETE EQUIPMENT $5,340 $11,938 Not Implemented
OR0611 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $2,436 $2,159 Not Implemented
OR0611 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,410 $3,724 Not Implemented
OR0611 # 07 Y:2013 07 2013 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $1,200 $5,464 Not Implemented