Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,567
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0886 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,238 | $7,500 | Not Implemented |
UD0886 # 04 Y:2013 | 04 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $20,782 | $50,000 | Not Implemented |
UD0886 # 05 Y:2013 | 05 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,028 | $0 | Not Implemented |
UD0886 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,761 | $0 | Not Implemented |
UD0886 # 07 Y:2013 | 07 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $36,728 | $14,900 | Implemented |
UD0886 # 08 Y:2013 | 08 | 2013 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $4,035 | $3,550 | Not Implemented |
UD0886 # 09 Y:2013 | 09 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $16,109 | $27,000 | Not Implemented |
UD0886 # 10 Y:2013 | 10 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $575 | $1,000 | Not Implemented |
UD0886 # 11 Y:2013 | 11 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $341 | $0 | Implemented |
UD0886 # 12 Y:2013 | 12 | 2013 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,648 | $6,720 | Implemented |
UD0886 # 13 Y:2013 | 13 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,167 | $0 | Not Implemented |
UD0886 # 14 Y:2013 | 14 | 2013 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $2,995 | $0 | Implemented |
UD0886 # 15 Y:2013 | 15 | 2013 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $9,716 | $30,000 | Not Implemented |
UD0886 # 16 Y:2013 | 16 | 2013 | REDUCE VENTILATION AIR | $32,467 | $20,000 | Not Implemented |
MA0711 # 01 Y:2013 | 01 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,618 | $35,000 | Not Implemented |
MA0711 # 02 Y:2013 | 02 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,430 | $25,000 | Not Implemented |
MA0711 # 03 Y:2013 | 03 | 2013 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $6,314 | $14,000 | Not Implemented |
MA0711 # 04 Y:2013 | 04 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,170 | $2,000 | Implemented |
MA0711 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,165 | $4,055 | Implemented |
MI0244 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,762 | $68,060 | Not Implemented |
MI0244 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,361 | $1,800 | Implemented |
MI0244 # 03 Y:2013 | 03 | 2013 | INSTALL SKYLIGHTS | $3,415 | $2,780 | Implemented |
MI0244 # 04 Y:2013 | 04 | 2013 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,133 | $2,600 | Not Implemented |
MI0244 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,214 | $80 | Implemented |
MI0244 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,120 | $3,520 | Not Implemented |