IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,567

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0234 # 02 Y:2013 02 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,388 $80 Implemented
MI0234 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,377 $1,660 Implemented
MI0234 # 04 Y:2013 04 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,115 $8,409 Implemented
MI0234 # 05 Y:2013 05 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,067 $2,520 Implemented
MI0234 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,103 $80 Implemented
MI0234 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $311 $600 Not Implemented
MI0234 # 08 Y:2013 08 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $252 $447 Implemented
MI0234 # 09 Y:2013 09 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $159 $380 Not Implemented
TT0101 # 01 Y:2012 01 2012 USE CORRECT SIZE STEAM TRAPS $33,071 $12,000 Implemented
TT0101 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,315 $3,000 Implemented
TT0101 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,527 $45,923 Not Implemented
TT0101 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,915 $12,372 Not Implemented
TT0101 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $617 $2,994 Not Implemented
TT0101 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,803 $15,990 Not Implemented
TT0101 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,046 $13,216 Not Implemented
TT0101 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,439 $714 Not Implemented
TT0101 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $114 $764 Not Implemented
TT0101 # 10 Y:2012 10 2012 INSTALL OCCUPANCY SENSORS $8,082 $6,528 Not Implemented
TT0101 # 11 Y:2012 11 2012 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $6,395 $100,000 Not Implemented
DL0098 # 01 Y:2012 01 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $92,987 $22,000 Implemented
DL0098 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,900 $18,000 Implemented
DL0098 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,100 $18,000 Implemented
DL0098 # 04 Y:2012 04 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $10,500 $19,500 Implemented
DL0098 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,060 $4,880 Implemented
DL0098 # 06 Y:2012 06 2012 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $700 $500 Not Implemented