IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,503

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0449 # 06 Y:2011 06 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $697 $0 Implemented
UF0449 # 07 Y:2011 07 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $3,726 $1,919 Not Implemented
UF0449 # 08 Y:2011 08 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,799 $7,128 Not Implemented
UF0449 # 09 Y:2011 09 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $659 $686 Implemented
UF0449 # 10 Y:2011 10 2011 AIR CONDITION ONLY SPACE NECESSARY $227 $21 Implemented
UF0449 # 11 Y:2011 11 2011 USE OPTIMUM THICKNESS INSULATION $1,450 $576 Not Implemented
NC0438 # 01 Y:2011 01 2011 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $62,448 $94,000 Not Implemented
NC0438 # 02 Y:2011 02 2011 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $8,972 $7,800 Implemented
NC0438 # 03 Y:2011 03 2011 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $19,068 $32,000 Not Implemented
NC0438 # 04 Y:2011 04 2011 REPAIR OR REPLACE STEAM TRAPS $19,936 $5,500 Not Implemented
NC0438 # 05 Y:2011 05 2011 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $43,023 $92,800 Not Implemented
NC0438 # 06 Y:2011 06 2011 DEVELOP A REPAIR/REPLACE POLICY $5,515 $5,548 Not Implemented
NC0438 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,224 $300 Implemented
NC0438 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $1,416 $2,112 Implemented
TT0080 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,663 $100 Implemented
TT0080 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,837 $7,143 Not Implemented
TT0080 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $546 $977 Not Implemented
TT0080 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,064 $4,400 Not Implemented
TT0080 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,663 $10,287 Not Implemented
TT0080 # 06 Y:2011 06 2011 INSTALL TIMERS AND/OR THERMOSTATS $3,475 $400 Not Implemented
UF0445 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,864 $4,542 Implemented
UF0445 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,543 $9,823 Not Implemented
UF0445 # 03 Y:2011 03 2011 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,693 $939 Not Implemented
UF0445 # 04 Y:2011 04 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $25,323 $75,000 Implemented
UF0445 # 05 Y:2011 05 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $43,678 $2,580 Not Implemented