IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0360 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $244,785 $930,000 Not Implemented
MS0360 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,795 $240,500 Implemented
MS0360 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,606 $18,481 Not Implemented
AM0587 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $8,000 $5,000 Implemented
AM0587 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,460 $21,600 Implemented
AM0587 # 03 Y:2010 03 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $5,760 $1,030 Implemented
AM0587 # 04 Y:2010 04 2010 OPTIMIZE PLANT POWER FACTOR $5,087 $21,130 Not Implemented
AM0587 # 05 Y:2010 05 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,760 $42 Not Implemented
AM0587 # 06 Y:2010 06 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,250 $500 Implemented
AM0587 # 07 Y:2010 07 2010 INSTALL SKYLIGHTS $2,550 $2,030 Not Implemented
AM0587 # 08 Y:2010 08 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,521 $560 Implemented
AM0587 # 09 Y:2010 09 2010 USE SYNTHETIC LUBRICANT $980 $0 Not Implemented
MS0362 # 01 Y:2010 01 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $129,172 $586,857 Implemented
WV0417 # 01 Y:2010 01 2010 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $34,786 $29,500 Not Implemented
WV0417 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,811 $46,085 Implemented
WV0417 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $10,416 $8,214 Implemented
WV0417 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $6,314 $1,220 Implemented
WV0417 # 05 Y:2010 05 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,608 $3,000 Implemented
WV0417 # 06 Y:2010 06 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,780 $4,485 Not Implemented
WV0417 # 07 Y:2010 07 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,311 $7,750 Not Implemented
WV0417 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,656 $1,188 Implemented
WV0417 # 09 Y:2010 09 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,334 $1,500 Implemented
WV0417 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $976 $1,290 Not Implemented
WV0416 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,244 $30,500 Not Implemented
WV0416 # 02 Y:2010 02 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,496 $2,500 Implemented