IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0061 # 04 Y:2010 04 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,400 $5,200 Not Implemented
DL0061 # 05 Y:2010 05 2010 ADD AREA LIGHTING SWITCHES $23,365 $120 Implemented
DL0061 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $414 $440 Implemented
DL0061 # 07 Y:2010 07 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,800 $2,400 Not Implemented
DL0061 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $246 $400 Not Implemented
DL0061 # 09 Y:2010 09 2010 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $438 $1,100 Not Implemented
DL0061 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,529 $47,000 Implemented
DL0061 # 11 Y:2010 11 2010 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,440 $13,400 Not Implemented
DL0061 # 12 Y:2010 12 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,690 $5,550 Not Implemented
DL0061 # 13 Y:2010 13 2010 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $860 $8,000 Not Implemented
DL0061 # 14 Y:2010 14 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,396 $20,804 Implemented
NC0406 # 01 Y:2010 01 2010 ADOPT IN-HOUSE MATERIAL GENERATION $77,083 $85,000 Not Implemented
NC0406 # 02 Y:2010 02 2010 TREAT AND REUSE RINSE WATERS $51,487 $8,875 Not Implemented
NC0406 # 03 Y:2010 03 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,177 $50 Implemented
NC0406 # 04 Y:2010 04 2010 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $16,743 $50,000 Implemented
NC0406 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,835 $100 Implemented
NC0406 # 06 Y:2010 06 2010 RECOVER WASTE HEAT FROM EQUIPMENT $10,210 $15,045 Not Implemented
NC0406 # 07 Y:2010 07 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,747 $8,000 Not Implemented
NC0406 # 08 Y:2010 08 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $508 $920 Implemented
NC0406 # 09 Y:2010 09 2010 INSTALL OCCUPANCY SENSORS $1,958 $3,256 Implemented
NC0406 # 10 Y:2010 10 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $276,388 $214,700 Implemented
NC0406 # 11 Y:2010 11 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $20,625 $50,000 Implemented
SU0300 # 01 Y:2010 01 2010 REPAIR OR REPLACE STEAM TRAPS $64,500 $3,122 Implemented
SU0300 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,801 $1,925 Implemented
SU0300 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $828 $883 Not Implemented