Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,556
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0061 # 04 Y:2010 | 04 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,400 | $5,200 | Not Implemented |
DL0061 # 05 Y:2010 | 05 | 2010 | ADD AREA LIGHTING SWITCHES | $23,365 | $120 | Implemented |
DL0061 # 06 Y:2010 | 06 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $414 | $440 | Implemented |
DL0061 # 07 Y:2010 | 07 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,800 | $2,400 | Not Implemented |
DL0061 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $246 | $400 | Not Implemented |
DL0061 # 09 Y:2010 | 09 | 2010 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $438 | $1,100 | Not Implemented |
DL0061 # 10 Y:2010 | 10 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,529 | $47,000 | Implemented |
DL0061 # 11 Y:2010 | 11 | 2010 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,440 | $13,400 | Not Implemented |
DL0061 # 12 Y:2010 | 12 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,690 | $5,550 | Not Implemented |
DL0061 # 13 Y:2010 | 13 | 2010 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $860 | $8,000 | Not Implemented |
DL0061 # 14 Y:2010 | 14 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,396 | $20,804 | Implemented |
NC0406 # 01 Y:2010 | 01 | 2010 | ADOPT IN-HOUSE MATERIAL GENERATION | $77,083 | $85,000 | Not Implemented |
NC0406 # 02 Y:2010 | 02 | 2010 | TREAT AND REUSE RINSE WATERS | $51,487 | $8,875 | Not Implemented |
NC0406 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,177 | $50 | Implemented |
NC0406 # 04 Y:2010 | 04 | 2010 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,743 | $50,000 | Implemented |
NC0406 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,835 | $100 | Implemented |
NC0406 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,210 | $15,045 | Not Implemented |
NC0406 # 07 Y:2010 | 07 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,747 | $8,000 | Not Implemented |
NC0406 # 08 Y:2010 | 08 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $508 | $920 | Implemented |
NC0406 # 09 Y:2010 | 09 | 2010 | INSTALL OCCUPANCY SENSORS | $1,958 | $3,256 | Implemented |
NC0406 # 10 Y:2010 | 10 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $276,388 | $214,700 | Implemented |
NC0406 # 11 Y:2010 | 11 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $20,625 | $50,000 | Implemented |
SU0300 # 01 Y:2010 | 01 | 2010 | REPAIR OR REPLACE STEAM TRAPS | $64,500 | $3,122 | Implemented |
SU0300 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,801 | $1,925 | Implemented |
SU0300 # 03 Y:2010 | 03 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $828 | $883 | Not Implemented |