IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0009 # 14 Y:2007 14 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $20,475 $1,275,000 Not Implemented
UM0332 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $366,043 $516,500 Not Implemented
UM0332 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,464 $1,000 Implemented
UM0332 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $45,783 $500 Implemented
UM0332 # 04 Y:2007 04 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $26,141 $12,385 Implemented
UM0332 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,954 $638 Implemented
UM0332 # 06 Y:2007 06 2007 USE RADIANT HEATER FOR SPOT HEATING $2,065 $10,000 Not Implemented
UM0332 # 07 Y:2007 07 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,180 $1,540 Not Implemented
NC0370 # 01 Y:2007 01 2007 ADJUST BURNERS FOR EFFICIENT OPERATION $30,975 $65,000 Not Implemented
NC0370 # 02 Y:2007 02 2007 REPAIR OR REPLACE STEAM TRAPS $43,809 $17,100 Not Implemented
NC0370 # 03 Y:2007 03 2007 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $48,420 $25,000 Not Implemented
NC0370 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $27,567 $74,816 Not Implemented
NC0370 # 05 Y:2007 05 2007 RECOVER WASTE HEAT FROM EQUIPMENT $45,052 $88,200 Not Implemented
NC0370 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $74,891 $121,780 Not Implemented
NC0370 # 07 Y:2007 07 2007 RECOVER WASTE HEAT FROM EQUIPMENT $87,257 $136,000 Not Implemented
NC0370 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,768 $120,500 Not Implemented
NC0370 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,690 $50 Not Implemented
NC0370 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,644 $7,240 Not Implemented
UD0767 # 01 Y:2007 01 2007 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $30,284 $1,500 Implemented
UD0767 # 02 Y:2007 02 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $20,419 $17,235 Not Implemented
UD0767 # 03 Y:2007 03 2007 UPGRADE CONTROLS ON COMPRESSORS $14,876 $0 Not Implemented
UD0767 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,731 $33,190 Not Implemented
UD0767 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,309 $7,740 Not Implemented
UD0767 # 06 Y:2007 06 2007 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,922 $5,000 Not Implemented
UD0767 # 07 Y:2007 07 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,625 $2,175 Implemented