IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0779 # 01 Y:2023 01 2023 ELIMINATE/REDUCE AN OPERATION $3,315 $0 Not Implemented
OR0779 # 02 Y:2023 02 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,749 $0 Not Implemented
OR0779 # 03 Y:2023 03 2023 ADOPT IN-HOUSE MATERIAL GENERATION $43,575 $54,837 Not Implemented
OR0779 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $4,725 $57,101 Not Implemented
SJ0008 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,195 $77,365 Not Implemented
SJ0008 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $365 $0 Implemented
SJ0008 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $80 $0 Not Implemented
SJ0008 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $126 $436 Not Implemented
SJ0008 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $265 $344 Implemented
SJ0008 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $78 $177 Not Implemented
GT0971 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,890 $1,850 Not Implemented
GT0971 # 02 Y:2023 02 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $3,384 $400 Not Implemented
GT0971 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,632 $867 Not Implemented
GT0971 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,705 $17,982 Not Implemented
GT0971 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $1,025 $5,227 Not Implemented
GT0971 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $137,329 $2,565,299 Not Implemented
SU0537 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,479 $0 Not Implemented
SU0537 # 02 Y:2023 02 2023 DISCONNECT BALLASTS $140 $0 Not Implemented
SU0537 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $939 $0 Not Implemented
SU0537 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,744 $0 Not Implemented
SU0537 # 05 Y:2023 05 2023 RECOVER WASTE HEAT FROM EQUIPMENT $38,869 $390 Not Implemented
SU0537 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,763 $500 Not Implemented
SU0537 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,091 $140 Not Implemented
SU0537 # 08 Y:2023 08 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,448 $742 Not Implemented
SU0537 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,268 $521 Not Implemented