IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0415 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,372 $1,000 Implemented
AS0415 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $928 $3,000 Not Implemented
AS0415 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $810 $12,174 Not Implemented
AS0415 # 06 Y:2006 06 2006 USE SOLAR HEAT TO HEAT WATER $132 $2,800 Not Implemented
LE0226 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $154,145 $75,000 Implemented
LE0226 # 02 Y:2006 02 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $109,146 $363,000 Not Implemented
LE0226 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $81,919 $51,275 Implemented
LE0226 # 04 Y:2006 04 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $64,647 $2,500 Not Implemented
LE0226 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,061 $47,500 Implemented
LE0226 # 06 Y:2006 06 2006 REPAIR AND ELIMINATE STEAM LEAKS $14,515 $800 Implemented
LE0226 # 07 Y:2006 07 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $8,946 $16,000 Not Implemented
LE0226 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $500 Implemented
NC0332 # 01 Y:2006 01 2006 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $20,455 $12,000 Not Implemented
NC0332 # 02 Y:2006 02 2006 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $39,950 $210,000 Not Implemented
NC0332 # 03 Y:2006 03 2006 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $17,210 $28,200 Not Implemented
NC0332 # 04 Y:2006 04 2006 INSULATE FEEDWATER TANK $389 $277 Not Implemented
NC0332 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $406 $86 Not Implemented
MA0596 # 01 Y:2006 01 2006 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $50,414 $4,000 Implemented
MA0596 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,617 $75,860 Implemented
MA0596 # 03 Y:2006 03 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,740 $5,440 Implemented
MA0596 # 04 Y:2006 04 2006 USE UTILITY CONTROLLED POWER MANAGEMENT $9,148 $4,500 Implemented
MA0596 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,400 $37,895 Implemented
MA0596 # 06 Y:2006 06 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,195 $13,000 Implemented
MA0596 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $4,855 $8,000 Implemented
MA0596 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,870 $18,200 Not Implemented