IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0201 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,182 $3,211 Implemented
SU0201 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,591 $20,054 Not Implemented
MI0097 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,490 $2,100 Not Implemented
MI0097 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $59,412 $800 Not Implemented
MI0097 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,212 $52,535 Not Implemented
MI0097 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,883 $30 Not Implemented
MI0097 # 05 Y:2005 05 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,188 $7,077 Not Implemented
MI0097 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $28,209 $71,500 Not Implemented
AM0475 # 01 Y:2004 01 2004 REPAIR OR REPLACE STEAM TRAPS $19,000 $650 Implemented
AM0475 # 02 Y:2004 02 2004 REPAIR AND ELIMINATE STEAM LEAKS $5,800 $700 Implemented
AM0475 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,390 $500 Implemented
AM0475 # 04 Y:2004 04 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,170 $4,600 Not Implemented
AM0475 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,100 $300 Implemented
AM0475 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,020 $33 Implemented
AM0475 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,290 $400 Not Implemented
AM0475 # 08 Y:2004 08 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,490 $900 Implemented
AM0475 # 09 Y:2004 09 2004 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,600 $12,500 Not Implemented
AM0475 # 10 Y:2004 10 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,740 $425 Implemented
AM0475 # 11 Y:2004 11 2004 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $572 $699 Not Implemented
AM0475 # 12 Y:2004 12 2004 INSULATE BARE EQUIPMENT $450 $60 Not Implemented
MS0256 # 01 Y:2004 01 2004 INSTALL HYDROGEN FUEL CELL $711,668 $7,500,000 n/a
MS0256 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $53,846 $54,000 n/a
MS0256 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $34,367 $1,000 Implemented
MS0256 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,725 $3,794 Implemented
MS0256 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,059 $11,743 Not Implemented