IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0343 # 06 Y:2004 06 2004 INCREASE USE OF AUTOMATION $75,100 $65,000 Not Implemented
SD0343 # 07 Y:2004 07 2004 INCREASE USE OF AUTOMATION $38,050 $25,000 Not Implemented
SD0343 # 08 Y:2004 08 2004 INCREASE USE OF AUTOMATION $38,050 $40,000 Not Implemented
WI0472 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,956 $16,640 n/a
WI0472 # 02 Y:2004 02 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,258 $9,780 n/a
WI0472 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $1,700 $5,500 n/a
WI0472 # 04 Y:2004 04 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $596 $640 n/a
WI0472 # 05 Y:2004 05 2004 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,375 $1,145 n/a
WI0472 # 06 Y:2004 06 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,106 $5,500 n/a
WI0472 # 07 Y:2004 07 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $566 $500 n/a
WI0472 # 08 Y:2004 08 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,032 $700 n/a
SF0284 # 01 Y:2004 01 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $46,318 $4,640 Not Implemented
SF0284 # 02 Y:2004 02 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,601 $3,625 Not Implemented
SF0284 # 03 Y:2004 03 2004 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,202 $2,331 Implemented
SF0284 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,933 $12,763 Implemented
SF0284 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $5,065 $3,065 Not Implemented
SF0284 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,841 $8,312 Not Implemented
SF0284 # 07 Y:2004 07 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $39,674 $43,664 Not Implemented
SF0284 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,661 $1,900 Not Implemented
SF0284 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $554 $1,152 Not Implemented
SF0284 # 10 Y:2004 10 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,103 $50,000 Not Implemented
SF0284 # 11 Y:2004 11 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $13,300 $3,000 Implemented
UM0254 # 01 Y:2004 01 2004 ADOPT IN-HOUSE MATERIAL GENERATION $31,255 $30,000 Not Implemented
UM0254 # 02 Y:2004 02 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,650 $2,200 Implemented
UM0254 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,907 $0 Implemented