IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,556

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0254 # 04 Y:2004 04 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,584 $15,000 Not Implemented
UM0254 # 05 Y:2004 05 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,267 $10,000 Not Implemented
UM0254 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,010 $1,080 Implemented
UM0254 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,479 $1,038 Implemented
OR0455 # 01 Y:2004 01 2004 RECOVER AND REUSE WASTE MATERIAL $45,100 $16,200 Implemented
OR0455 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,570 $0 Implemented
OR0455 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,670 $6,670 Not Implemented
OR0455 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $2,140 $1,750 Implemented
OR0455 # 05 Y:2004 05 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,420 $150 Implemented
OR0455 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,510 $790 Not Implemented
NC0283 # 01 Y:2004 01 2004 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $22,500 $18,300 Not Implemented
NC0283 # 02 Y:2004 02 2004 RECOVER AND REUSE COOLING WATER $7,112 $6,000 Implemented
NC0283 # 03 Y:2004 03 2004 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,469 $1,200 Implemented
NC0283 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,379 $6,899 Not Implemented
NC0283 # 05 Y:2004 05 2004 INSTALL OCCUPANCY SENSORS $1,077 $356 Implemented
MI0076 # 01 Y:2004 01 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $1,283 $0 Not Implemented
MI0076 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $2,032 $2,300 Not Implemented
MI0076 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,535 $1,370 Implemented
MI0076 # 04 Y:2004 04 2004 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $3,936 $6,000 Implemented
MI0076 # 05 Y:2004 05 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,834 $400 Not Implemented
MI0076 # 06 Y:2004 06 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $45,000 $23,400 Implemented
NC0281 # 01 Y:2004 01 2004 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $193,423 $70,000 Not Implemented
NC0281 # 02 Y:2004 02 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $73,723 $50 Not Implemented
NC0281 # 03 Y:2004 03 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,625 $35,000 Not Implemented
NC0281 # 04 Y:2004 04 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,838 $6,000 Not Implemented