Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,556
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0281 # 05 Y:2004 | 05 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,258 | $4,000 | Not Implemented |
NC0281 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,158 | $1,060 | Not Implemented |
NC0281 # 07 Y:2004 | 07 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $700 | $400 | Not Implemented |
AS0376 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,069 | $60 | Not Implemented |
AS0376 # 02 Y:2004 | 02 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,286 | $2,016 | Not Implemented |
AS0376 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,889 | $1,550 | Not Implemented |
LE0183 # 01 Y:2004 | 01 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $54,350 | $390,000 | n/a |
LE0183 # 02 Y:2004 | 02 | 2004 | REPAIR OR REPLACE STEAM TRAPS | $49,237 | $10,000 | Implemented |
LE0183 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $12,090 | $7,000 | Not Implemented |
LE0183 # 04 Y:2004 | 04 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,113 | $2,497 | Not Implemented |
LE0183 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,591 | $750 | Not Implemented |
LE0183 # 06 Y:2004 | 06 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,467 | $500 | Not Implemented |
LE0183 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,086 | $21,041 | Not Implemented |
WI0464 # 01 Y:2004 | 01 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,751 | $48,510 | n/a |
WI0464 # 02 Y:2004 | 02 | 2004 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,969 | $6,500 | Not Implemented |
WI0464 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,856 | $0 | Implemented |
WI0464 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,860 | $1,000 | Implemented |
WI0464 # 05 Y:2004 | 05 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,256 | $428 | Not Implemented |
WI0464 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $468 | $0 | Not Implemented |
WI0464 # 07 Y:2004 | 07 | 2004 | INSTALL AUTOMATIC STACK DAMPER | $409 | $1,800 | Not Implemented |
WI0464 # 08 Y:2004 | 08 | 2004 | INSTALL OCCUPANCY SENSORS | $149 | $149 | Not Implemented |
BD0255 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $16,352 | $17,885 | Not Implemented |
BD0255 # 02 Y:2004 | 02 | 2004 | INSTALL REPLACEMENT DOORS | $13,961 | $14,000 | Not Implemented |
BD0255 # 03 Y:2004 | 03 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $11,914 | $11,000 | Not Implemented |
BD0255 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,576 | $13,050 | Not Implemented |