IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,299

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0255 # 01 Y:2003 01 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,219 $310 Not Implemented
WV0255 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,774 $100 Implemented
WV0255 # 03 Y:2003 03 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $965 $2,700 Not Implemented
WV0255 # 04 Y:2003 04 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,019 $200 Not Implemented
WV0255 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,236 $2,025 Implemented
WV0255 # 06 Y:2003 06 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $42,452 $2,000 Implemented
WV0255 # 07 Y:2003 07 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $27,449 $2,455 Not Implemented
WV0255 # 08 Y:2003 08 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,094 $1,000 Implemented
WV0255 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,875 $0 Implemented
WV0255 # 10 Y:2003 10 2003 REDUCE EXCESS STEAM BLEEDING $4,622 $80,000 Not Implemented
WV0255 # 11 Y:2003 11 2003 MINIMIZE WATER USAGE $315,882 $25,000 Not Implemented
SF0252 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,775 $500 Implemented
SF0252 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $814 Not Implemented
SF0252 # 03 Y:2003 03 2003 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $2,342 $4,612 Not Implemented
SF0252 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $846 $2,550 Implemented
SF0252 # 05 Y:2003 05 2003 INSTALL WIND POWERED ELECTRIC GENERATOR $23,641 $205,000 Not Implemented
GT0746 # 01 Y:2003 01 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,932 $44,000 Not Implemented
GT0746 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,422 $0 Not Implemented
GT0746 # 03 Y:2003 03 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,113 $28,000 Not Implemented
GT0746 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,727 $2,500 Implemented
GT0746 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $0 Implemented
GT0746 # 06 Y:2003 06 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,357 $20,000 Not Implemented
GT0746 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,222 $14,500 Not Implemented
GT0746 # 08 Y:2003 08 2003 INSTALL OCCUPANCY SENSORS $227 $150 Not Implemented