IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,548

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0043 # 05 Y:2003 05 2003 USE SYNTHETIC LUBRICANT $4,235 $400 Not Implemented
UU0043 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,467 $1,500 Not Implemented
UU0043 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,718 $32,302 Implemented
UU0043 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,032 $0 Not Implemented
UU0043 # 01 Y:2003 01 2003 OPTIMIZE PLANT POWER FACTOR $3,833 $5,820 Not Implemented
LE0144 # 01 Y:2002 01 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,579 $1,000 Not Implemented
LE0144 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,456 $0 Not Implemented
LE0144 # 03 Y:2002 03 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,820 $9,600 Not Implemented
LE0144 # 04 Y:2002 04 2002 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $968 $0 Not Implemented
LE0144 # 05 Y:2002 05 2002 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $636 $0 Not Implemented
IC0056 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,010 $16,443 Not Implemented
IC0056 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,363 $23,600 Not Implemented
IC0056 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $949 $3,982 Not Implemented
IC0056 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,063 $400 Not Implemented
IC0056 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,571 $5,107 Not Implemented
IC0056 # 06 Y:2003 06 2003 REPAIR AND ELIMINATE STEAM LEAKS $17,396 $3,500 Not Implemented
IC0056 # 07 Y:2003 07 2003 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,043 $3,000 Not Implemented
IC0056 # 08 Y:2003 08 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $3,180 $4,206 Not Implemented
IC0056 # 09 Y:2003 09 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $1,770 $2,052 Not Implemented
IC0056 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $2,293 $683 Not Implemented
IC0056 # 11 Y:2003 11 2003 INSULATE BARE EQUIPMENT $1,329 $400 Not Implemented
LL0154 # 01 Y:2003 01 2003 REPAIR AND ELIMINATE STEAM LEAKS $18,488,939 $413,700 n/a
LL0154 # 02 Y:2003 02 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $11,340,034 $773,535 n/a
LL0154 # 03 Y:2003 03 2003 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $6,313,507 $750,000 Not Implemented
LL0154 # 04 Y:2003 04 2003 REDUCE EXCESS STEAM BLEEDING $504,716 $45,360 Not Implemented