IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,548

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0445 # 01 Y:2024 01 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $427,475 $602,500 n/a
OR0791 # 01 Y:2024 01 2024 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $29,053 $352,000 n/a
OR0791 # 02 Y:2024 02 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,032 $0 n/a
OR0791 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $2,606 $17,324 n/a
OR0791 # 04 Y:2024 04 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $2,079 $5,750 n/a
AS0581 # 01 Y:2024 01 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $114,491 $1,279,371 n/a
AS0581 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $30,471 $40,000 n/a
AS0581 # 03 Y:2024 03 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,885 $8,703 n/a
AS0581 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $1,195 $514 n/a
AS0581 # 05 Y:2024 05 2024 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $161 $322 n/a
AS0581 # 06 Y:2024 06 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $80 $178 n/a
UL2407 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,343 $0 n/a
UL2407 # 07 Y:2024 07 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,307 $10,000 n/a
UL2407 # 05 Y:2024 05 2024 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $41,469 $69,175 n/a
UL2407 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $77,264 $788,082 n/a
UL2407 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $184 $342 n/a
UL2407 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,908 $5,457 n/a
UL2407 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $34,496 $23,699 n/a
UF0618 # 07 Y:2024 07 2024 IMPROVE SPACE COMFORT CONDITIONING $10,000 $1,931 n/a
UF0618 # 06 Y:2024 06 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,621 $12,380 n/a
UF0618 # 05 Y:2024 05 2024 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $150,000 $70,000 n/a
UF0618 # 04 Y:2024 04 2024 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $308,175 $14,388 n/a
UF0618 # 03 Y:2024 03 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,409 $5,855 n/a
UF0618 # 02 Y:2024 02 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $1,789 $872 n/a
UF0618 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $19,157 $112,913 n/a