IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,567

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0908 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $621 $432 Implemented
OK0908 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $7,829 $59,743 Not Implemented
UA0136 # 01 Y:2015 01 2015 INCREASE AMOUNT OF CONDENSATE RETURNED $62,198 $11,224 Not Implemented
UA0136 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,296 $22,500 Not Implemented
UA0136 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $35,414 $50 Not Implemented
UA0136 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,776 $2,922 Implemented
UA0136 # 05 Y:2015 05 2015 UPGRADE CONTROLS ON COMPRESSORS $2,916 $5,250 Not Implemented
UA0136 # 06 Y:2015 06 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $17,386 $0 Not Implemented
UA0136 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,384 $14,682 Not Implemented
NC0536 # 01 Y:2015 01 2015 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS $88,496 $300,000 Not Implemented
NC0536 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $15,080 $10,000 Not Implemented
NC0536 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,195 $9,000 Not Implemented
NC0536 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,004 $100 Not Implemented
NC0536 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,199 $15,557 Not Implemented
NC0536 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $347 Not Implemented
NC0536 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,618 $1,873 Not Implemented
NC0536 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314 $206 Not Implemented
NC0536 # 09 Y:2015 09 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $2,508 $351 Not Implemented
UD0921 # 01 Y:2015 01 2015 REDUCE VENTILATION AIR $16,159 $0 Implemented
UD0921 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $405 $0 Implemented
UD0921 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $723 $0 Not Implemented
UD0921 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $381 $275 Implemented
UD0921 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,887 $950 Implemented
UD0921 # 06 Y:2015 06 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,838 $1,250 Not Implemented
UD0921 # 07 Y:2015 07 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,470 $1,000 Not Implemented