Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,503
matching recommendationsNAICS | 325 | Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0656 # 10 Y:2014 | 10 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $383 | $0 | Not Implemented |
AM0656 # 11 Y:2014 | 11 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $375 | $265 | Not Implemented |
UD0901 # 01 Y:2014 | 01 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,645 | $1,000 | Not Implemented |
UD0901 # 02 Y:2014 | 02 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,289 | $800 | Not Implemented |
UD0901 # 03 Y:2014 | 03 | 2014 | INSTALL OCCUPANCY SENSORS | $1,149 | $190 | Not Implemented |
UD0901 # 04 Y:2014 | 04 | 2014 | RECOVER AND REUSE COOLING WATER | $221,902 | $100,000 | Implemented |
UD0901 # 05 Y:2014 | 05 | 2014 | REDUCE FLUID FLOW RATES | $151,019 | $100,000 | Implemented |
UD0901 # 06 Y:2014 | 06 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $25,546 | $28,000 | Not Implemented |
UD0901 # 07 Y:2014 | 07 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,426 | $0 | Not Implemented |
UD0901 # 08 Y:2014 | 08 | 2014 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $3,748 | $1,000 | Not Implemented |
UD0901 # 09 Y:2014 | 09 | 2014 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $2,267 | $8,850 | Not Implemented |
UD0901 # 10 Y:2014 | 10 | 2014 | REDUCE VENTILATION AIR | $31,388 | $33,025 | Implemented |
UD0901 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,379 | $16,055 | Not Implemented |
DL0128 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $59,000 | $150,000 | Implemented |
DL0128 # 02 Y:2014 | 02 | 2014 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $28,000 | $50,000 | Not Implemented |
DL0128 # 03 Y:2014 | 03 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,150 | $101,600 | Implemented |
DL0128 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $18,200 | $12,560 | Implemented |
DL0128 # 05 Y:2014 | 05 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,000 | $20,000 | Implemented |
DL0128 # 06 Y:2014 | 06 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,300 | $15,000 | Not Implemented |
DL0126 # 01 Y:2014 | 01 | 2014 | ADOPT IN-HOUSE MATERIAL GENERATION | $283,400 | $116,500 | Implemented |
DL0126 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,000 | $9,600 | Not Implemented |
DL0126 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,400 | $9,600 | Not Implemented |
DL0126 # 04 Y:2014 | 04 | 2014 | ADJUST BURNERS FOR EFFICIENT OPERATION | $15,000 | $50,000 | Not Implemented |
DL0126 # 05 Y:2014 | 05 | 2014 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $11,910 | $8,200 | Not Implemented |
DL0126 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,180 | $4,800 | Not Implemented |