IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0617 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $300 $1,250 Not Implemented
NC0617 # 06 Y:2018 06 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,162 $50,000 Implemented
NC0617 # 03 Y:2018 03 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $352 $90 Implemented
NC0617 # 04 Y:2018 04 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,137 $12,000 Implemented
NC0617 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,647 $16,472 Implemented
NC0617 # 02 Y:2018 02 2018 USE PHOTOCELL CONTROLS $1,341 $450 Implemented
NC0569 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,698 $200 Implemented
NC0569 # 01 Y:2016 01 2016 RECOVER WASTE HEAT FROM EQUIPMENT $68,453 $280,000 Not Implemented
NC0569 # 02 Y:2016 02 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,493 $48,500 Not Implemented
NC0569 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,856 $230 Not Implemented
NC0569 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,986 $18,150 Implemented
NC0569 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $423 $150 Implemented
NC0569 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,208 $33,756 Implemented
NC0569 # 07 Y:2016 07 2016 DEVELOP A REPAIR/REPLACE POLICY $2,230 $4,256 Implemented
NC0536 # 01 Y:2015 01 2015 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS $88,496 $300,000 Not Implemented
NC0536 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $15,080 $10,000 Not Implemented
NC0536 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $12,195 $9,000 Not Implemented
NC0536 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,004 $100 Not Implemented
NC0536 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,199 $15,557 Not Implemented
NC0536 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,475 $347 Not Implemented
NC0536 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314 $206 Not Implemented
NC0536 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,618 $1,873 Not Implemented
NC0536 # 09 Y:2015 09 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $2,508 $351 Not Implemented
NC0394 # 05 Y:2009 05 2009 RECOVER AND REUSE COOLING WATER $4,517 $3,850 Not Implemented
NC0394 # 02 Y:2009 02 2009 DEVELOP A REPAIR/REPLACE POLICY $5,639 $7,629 Not Implemented