IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW2402 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $282 $1,742 n/a
UW2402 # 02 Y:2024 02 2024 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,045 $582 n/a
UW2402 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,442 $5,083 n/a
UW2402 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $17,310 $375 n/a
UW2402 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $49,076 $311,400 n/a
UW2402 # 07 Y:2024 07 2024 USE SOLAR HEAT TO HEAT WATER $13,327 $84,652 n/a
UW2402 # 04 Y:2024 04 2024 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $55,000 $117,000 n/a
UW2402 # 05 Y:2024 05 2024 USE OTHER WASTE CONCENTRATION METHODS $25,000 $104,000 n/a
BS0138 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $11,555 $51,920 Not Implemented
BS0138 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $1,344 $270 Not Implemented
BS0138 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,016 $73,500 Not Implemented
OR0691 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $955 $1,955 Implemented
OR0691 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $772 $4,048 Not Implemented
OR0691 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,762 $1,200 Implemented
OR0691 # 01 Y:2017 01 2017 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,769 $39,442 Not Implemented
OR0611 # 02 Y:2013 02 2013 UPGRADE CONTROLS ON COMPRESSORS $8,684 $5,600 Not Implemented
OR0611 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $922 $2,134 Not Implemented
OR0611 # 03 Y:2013 03 2013 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,909 $37,830 Not Implemented
OR0611 # 01 Y:2013 01 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,437 $0 Not Implemented
OR0611 # 04 Y:2013 04 2013 UPGRADE OBSOLETE EQUIPMENT $5,340 $11,938 Not Implemented
OR0611 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $2,436 $2,159 Not Implemented
OR0611 # 06 Y:2013 06 2013 RECOVER WASTE HEAT FROM EQUIPMENT $5,410 $3,724 Not Implemented
OR0611 # 07 Y:2013 07 2013 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $1,200 $5,464 Not Implemented
UW0037 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $921 $1,842 Not Implemented
UW0037 # 02 Y:2010 02 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $709 $0 Implemented