IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

366

matching recommendations
Reset
NAICS 325 Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0241 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $30,220 $20,410 Implemented
MS0241 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,378 $129 Implemented
MS0241 # 11 Y:2003 11 2003 INSTALL TIMERS AND/OR THERMOSTATS $856 $1,575 Not Implemented
MS0241 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,721 $7,328 Not Implemented
MS0241 # 09 Y:2003 09 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,854 $3,600 Implemented
MS0241 # 04 Y:2003 04 2003 REPAIR AND ELIMINATE STEAM LEAKS $11,644 $760 Implemented
MS0241 # 08 Y:2003 08 2003 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,103 $1,102 Not Implemented
MS0241 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $25,062 $2,486 Not Implemented
MS0241 # 07 Y:2003 07 2003 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,613 $0 Implemented
MS0241 # 01 Y:2003 01 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $52,802 $8,788 n/a
MS0241 # 10 Y:2003 10 2003 INSTALL OCCUPANCY SENSORS $1,004 $416 Not Implemented
UM0244 # 02 Y:2003 02 2003 SIZE TRUCKS TO JOB $76,800 $54,000 Implemented
UM0244 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $13,221 Not Implemented
UM0244 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $2,023 $521 Implemented
UM0244 # 01 Y:2003 01 2003 $101,745 $30,000 Not Implemented
UM0244 # 04 Y:2003 04 2003 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $26,499 $51,860 Not Implemented
UM0244 # 03 Y:2003 03 2003 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $582 $2,477 Not Implemented
SU0170 # 08 Y:2003 08 2003 REPLACE BOILER $10,809 $33,514 Not Implemented
SU0170 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $466 $57 Implemented
SU0170 # 03 Y:2003 03 2003 $31,250 $1,000 Implemented
SU0170 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $3,181 $47 Implemented
SU0170 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,210 $0 Not Implemented
SU0170 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,229 $185 Implemented
SU0170 # 01 Y:2003 01 2003 $1,400 $0 Not Implemented
SU0170 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $21,666 $16,761 Not Implemented