IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0490 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,135 $2,192 Implemented
NC0490 # 08 Y:2013 08 2013 REPAIR OR REPLACE STEAM TRAPS $3,207 $5,500 Implemented
NC0490 # 07 Y:2013 07 2013 DEVELOP A REPAIR/REPLACE POLICY $1,508 $1,217 Implemented
NC0490 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $633 $50 Implemented
NC0490 # 05 Y:2013 05 2013 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,690 $65,000 Implemented
NC0490 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $213 $381 Implemented
NC0490 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,248 $4,989 Implemented
MA0711 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,170 $2,000 Implemented
MA0711 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,165 $4,055 Implemented
UD0881 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,622 $24,525 Implemented
UD0881 # 12 Y:2013 12 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $133 $100 Implemented
UD0881 # 11 Y:2013 11 2013 USE MINIMUM STEAM OPERATING PRESSURE $184 $200 Implemented
UD0881 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,191 $15,000 Implemented
UD0881 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,410 $50 Implemented
UD0881 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,640 $6,800 Implemented
UD0881 # 05 Y:2013 05 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,823 $1,200 Implemented
UD0881 # 04 Y:2013 04 2013 DEVELOP A REPAIR/REPLACE POLICY $1,024 $1,525 Implemented
UD0881 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,257 $0 Implemented