IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

995

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0745 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,936 $18,000 Not Implemented
UD0745 # 04 Y:2006 04 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $11,027 $30,000 Not Implemented
UD0745 # 05 Y:2006 05 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,968 $500 Not Implemented
UD0745 # 06 Y:2006 06 2006 METER WASTE WATER $10,810 $0 Not Implemented
UD0745 # 07 Y:2006 07 2006 USE OPTIMUM THICKNESS INSULATION $8,710 $4,000 Implemented
UD0745 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,810 $4,500 Not Implemented
UD0745 # 09 Y:2006 09 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $6,163 $12,326 Not Implemented
UD0745 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,746 $8,200 Implemented
UD0745 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,408 $0 Implemented
UD0745 # 12 Y:2006 12 2006 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $941 $0 Implemented
UD0745 # 13 Y:2006 13 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $592 $0 Not Implemented
UM0306 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,385 $2,500 Implemented
UM0306 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $11,812 $22,458 Not Implemented
UM0306 # 03 Y:2006 03 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,934 $2,500 Not Implemented
UM0306 # 04 Y:2006 04 2006 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $8,336 $7,520 Implemented
UM0306 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,571 $9,421 Implemented
UM0306 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,482 $2,429 Not Implemented
UM0306 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,558 $197 Implemented
LE0239 # 01 Y:2006 01 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $392,390 $95,000 Not Implemented
LE0239 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $280,038 $31,000 Not Implemented
LE0239 # 03 Y:2006 03 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $204,235 $200,000 Not Implemented
LE0239 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $115,069 $20,000 Not Implemented
LE0239 # 05 Y:2006 05 2006 COVER OPEN TANKS $23,836 $30,000 Not Implemented
LE0239 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,473 $28,000 Not Implemented
LE0239 # 07 Y:2006 07 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $10,599 $7,500 Not Implemented