IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

995

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0511 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,055 $140 Implemented
SU0511 # 01 Y:2022 01 2022 REDUCE VENTILATION AIR $9,835 $882 Not Implemented
UD1032 # 01 Y:2022 01 2022 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $58,668 $25,875 Not Implemented
UD1032 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,757 $0 Not Implemented
UD1032 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,018 $10,000 Not Implemented
UD1032 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $68,929 $100,000 Implemented
UD1032 # 05 Y:2022 05 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $14,725 $4,661 Not Implemented
UD1032 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,104 $0 Implemented
UD1032 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $19,725 $23,544 Not Implemented
UD1032 # 08 Y:2022 08 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $351,582 $1,000,000 Not Implemented
MI0393 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $100,476 $227,400 Not Implemented
MI0393 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $685 $480 Implemented
MI0393 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,195 $1,126 Not Implemented
MI0393 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $11,648 $3,107 Not Implemented
MI0393 # 05 Y:2021 05 2021 USE SOLAR HEAT TO HEAT WATER $12,942 $72,248 Not Implemented
MI0393 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,748 $2,211 Implemented
NL0056 # 01 Y:2021 01 2021 OPERATE DISTILLATION COLUMNS EFFICIENTLY $222,300 $82,500 Implemented
NL0056 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,032 $1,600 Implemented
NL0056 # 03 Y:2021 03 2021 REPAIR AND ELIMINATE STEAM LEAKS $8,331 $4,500 Not Implemented
NL0056 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,013 $11,549 Implemented
NL0056 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,169 $770 Implemented
UF0558 # 05 Y:2020 05 2020 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $40,098 $110,800 Implemented
UF0558 # 04 Y:2020 04 2020 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $1,517,489 $143,275 Implemented
UF0558 # 03 Y:2020 03 2020 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $42,983 $7,127 Implemented
UF0558 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $456 Implemented