IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

56

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0393 # 02 Y:2021 02 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $685 $480 Implemented
MI0393 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,195 $1,126 Not Implemented
MI0393 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $11,648 $3,107 Not Implemented
MI0393 # 05 Y:2021 05 2021 USE SOLAR HEAT TO HEAT WATER $12,942 $72,248 Not Implemented
MI0393 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,748 $2,211 Implemented
MI0393 # 01 Y:2021 01 2021 OPTIMIZE PLANT POWER FACTOR $100,476 $227,400 Not Implemented
UF0558 # 04 Y:2020 04 2020 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $1,517,489 $143,275 Implemented
UF0558 # 05 Y:2020 05 2020 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $40,098 $110,800 Implemented
UF0558 # 03 Y:2020 03 2020 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $42,983 $7,127 Implemented
UF0558 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,420 $456 Implemented
UF0558 # 01 Y:2020 01 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $20,597 $19,045 Implemented
UF0512 # 01 Y:2017 01 2017 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $401,159 $2,500,000 Not Implemented
UF0512 # 04 Y:2017 04 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,030 $40,000 Not Implemented
UF0512 # 05 Y:2017 05 2017 USE CORRECT SIZE STEAM TRAPS $27,893 $340 Implemented
UF0512 # 06 Y:2017 06 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,845 $2,750 Implemented
UF0512 # 02 Y:2017 02 2017 ISOLATE HOT OR COLD EQUIPMENT $124,880 $17,000 Implemented
UF0512 # 03 Y:2017 03 2017 OPTIMIZE PLANT POWER FACTOR $38,189 $13,000 Implemented
UF0512 # 11 Y:2017 11 2017 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $2,136 $1,562 Not Implemented
UF0512 # 12 Y:2017 12 2017 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $280,764 $300,000 Implemented
UF0512 # 10 Y:2017 10 2017 INSTALL COMMON HEADER ON COMPRESSORS $3,951 $11,185 Implemented
UF0512 # 07 Y:2017 07 2017 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $26,348 $725 Implemented
UF0512 # 08 Y:2017 08 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,636 $6,225 Implemented
UF0512 # 09 Y:2017 09 2017 INCREASE AMOUNT OF CONDENSATE RETURNED $4,891 $0 Implemented
UF0501 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $77,438 $2,184 Implemented
UF0501 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $154,176 $60,284 Implemented