IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 3251 Basic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2321 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $1,362 $3,175 n/a
KS2321 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $646 $1,328 n/a
KS2321 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,032 $5,480 n/a
KS2321 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $89,035 $701,322 n/a
KS2321 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,194 $18,538 n/a
KS2321 # 06 Y:2023 06 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,249 $627,000 n/a
KS2321 # 07 Y:2023 07 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $5,241 $1,770 n/a
KS2321 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $29,979 $30 n/a
MI0222 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,472 $19,980 Not Implemented
MI0222 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $94,284 $46,620 Not Implemented
MI0222 # 08 Y:2012 08 2012 INSTALL SKYLIGHTS $2,227 $960 Implemented
MI0222 # 07 Y:2012 07 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,893 $80 Implemented
MI0222 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,797 $2,726 Not Implemented
MI0222 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,363 $1,660 Implemented
MI0222 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $31,498 $6,660 Not Implemented
MI0222 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $38,910 $2,520 Implemented
GT0894 # 02 Y:2012 02 2012 USE PHOTOCELL CONTROLS $235 $270 Not Implemented
GT0894 # 01 Y:2012 01 2012 ADJUST BURNERS FOR EFFICIENT OPERATION $5,045 $0 Not Implemented
GT0894 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $656 $1,300 Not Implemented
GT0894 # 04 Y:2012 04 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $5,680 $7,500 Not Implemented
GT0894 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $20,940 $78,000 Not Implemented
GT0894 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,158 $32,620 Not Implemented
GT0894 # 08 Y:2012 08 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $65,080 $150,000 Not Implemented
GT0894 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,887 $3,466 Not Implemented
GT0894 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $11,820 $11,820 Not Implemented