IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

369

matching recommendations
Reset
NAICS 32518 Other Basic Inorganic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0539 # 01 Y:2003 01 2003 USE EVAPORATION TO CONCENTRATE MATERIAL $13,787 $12,870 Not Implemented
MA0539 # 02 Y:2003 02 2003 INSTALL TIMERS AND/OR THERMOSTATS $5,957 $650 Implemented
MA0539 # 03 Y:2003 03 2003 REDUCE VENTILATION AIR $301 $800 Implemented
MA0539 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $183 $0 Implemented
MA0539 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $63 $93 Not Implemented
AS0360 # 01 Y:2003 01 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,726 $10,607 Implemented
AS0360 # 02 Y:2003 02 2003 INSTALL OCCUPANCY SENSORS $344 $1,350 Not Implemented
AS0360 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,496 $30 Implemented
AS0360 # 04 Y:2003 04 2003 OPTIMIZE PLANT POWER FACTOR $10,463 $18,810 n/a
AS0360 # 05 Y:2003 05 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $2,253 $150 Implemented
AS0360 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $301 $616 Implemented
AS0360 # 07 Y:2003 07 2003 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $2,438 $8,705 Not Implemented
LL0156 # 01 Y:2003 01 2003 INCREASE AMOUNT OF CONDENSATE RETURNED $944,111 $379,982 Not Implemented
LL0156 # 02 Y:2003 02 2003 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $918,298 $3,111,056 Not Implemented
LL0156 # 03 Y:2003 03 2003 REPAIR AND ELIMINATE STEAM LEAKS $847,706 $1,220 Implemented
LL0156 # 04 Y:2003 04 2003 OPERATE BOILERS ON HIGH FIRE SETTING $103,102 $0 Not Implemented
LL0156 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $49,634 $3,890 Implemented
LL0156 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $32,003 $5,479 Implemented
LL0156 # 07 Y:2003 07 2003 REPAIR OR REPLACE STEAM TRAPS $343,385 $3,840 Implemented