IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

361

matching recommendations
Reset
NAICS 32518 Other Basic Inorganic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0599 # 06 Y:2020 06 2020 DEVELOP A REPAIR/REPLACE POLICY $13,389 $2,433 Not Implemented
WV0599 # 07 Y:2020 07 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,054 $14,700 Implemented
WV0599 # 08 Y:2020 08 2020 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $10,828 $39,480 Not Implemented
WV0599 # 09 Y:2020 09 2020 IMPROVE COMBUSTION CONTROL CAPABILITY $9,278 $8,650 Not Implemented
WV0599 # 10 Y:2020 10 2020 RECOVER WASTE HEAT FROM EQUIPMENT $7,356 $21,400 Implemented
WV0599 # 11 Y:2020 11 2020 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,587 $27,500 Not Implemented
WV0599 # 12 Y:2020 12 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,517 $2,256 Implemented
WV0599 # 13 Y:2020 13 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,644 $1,250 Implemented
LE0485 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,410 $17,950 Not Implemented
LE0485 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $28,883 $60,000 Not Implemented
LE0485 # 05 Y:2019 05 2019 REPLACE BOILER $162,332 $344,000 Not Implemented
LE0485 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,784 $9,200 Not Implemented
LE0485 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,180 $2,250 Not Implemented
LE0485 # 02 Y:2019 02 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,930 $7,500 Not Implemented
LE0485 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,517 $120 Not Implemented
OK1015 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,383 $12,752 Not Implemented
OK1015 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,577 $17,500 Not Implemented
OK1015 # 03 Y:2019 03 2019 INSTALL SET-BACK TIMERS $320 $200 Implemented
OK1015 # 04 Y:2019 04 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $435 Not Implemented
OK1015 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $427 $2,045 Implemented
UA0201 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $68,748 $22,020 Implemented
UA0201 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $29,283 $1,000 Implemented
UA0201 # 06 Y:2018 06 2018 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $588 $278 Implemented
UA0201 # 05 Y:2018 05 2018 INSULATE BARE EQUIPMENT $35,781 $56,161 Not Implemented
UA0201 # 04 Y:2018 04 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $100,960 $47,000 Implemented