IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
Reset
NAICS 325180 Other Basic Inorganic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0881 # 12 Y:2013 12 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $133 $100 Implemented
UD0881 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,622 $24,525 Implemented
UD0881 # 01 Y:2013 01 2013 COMBINE UTILITY METERS $18,015 $72,060 Not Implemented
UD0881 # 03 Y:2013 03 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,257 $0 Implemented
UD0881 # 04 Y:2013 04 2013 DEVELOP A REPAIR/REPLACE POLICY $1,024 $1,525 Implemented
UD0881 # 05 Y:2013 05 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,823 $1,200 Implemented
UD0881 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,640 $6,800 Implemented
UD0881 # 07 Y:2013 07 2013 REDUCE VENTILATION AIR $1,515 $3,000 Not Implemented
UD0881 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,410 $50 Implemented
UD0881 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $371 $1,000 Not Implemented
UD0881 # 10 Y:2013 10 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,191 $15,000 Implemented
UD0881 # 11 Y:2013 11 2013 USE MINIMUM STEAM OPERATING PRESSURE $184 $200 Implemented
UD0881 # 13 Y:2013 13 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,343 $55,500 Not Implemented
UD0881 # 14 Y:2013 14 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,378 $11,500 Not Implemented
UD0881 # 15 Y:2013 15 2013 COVER OPEN TANKS $3,707 $3,174 Not Implemented
UD0881 # 16 Y:2013 16 2013 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $24,715 $101,000 Not Implemented
UM0332 # 07 Y:2007 07 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,180 $1,540 Not Implemented
UM0332 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $366,043 $516,500 Not Implemented
UM0332 # 02 Y:2007 02 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,464 $1,000 Implemented
UM0332 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $45,783 $500 Implemented
UM0332 # 04 Y:2007 04 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $26,141 $12,385 Implemented
UM0332 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,954 $638 Implemented
UM0332 # 06 Y:2007 06 2007 USE RADIANT HEATER FOR SPOT HEATING $2,065 $10,000 Not Implemented
UD0743 # 11 Y:2006 11 2006 USE OPTIMUM TEMPERATURE $13,681 $0 Not Implemented
UD0743 # 01 Y:2006 01 2006 ADD AREA LIGHTING SWITCHES $206,125 $12,880 Not Implemented