IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

427

matching recommendations
Reset
NAICS 32519 Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0239 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,473 $28,000 Not Implemented
LE0239 # 07 Y:2006 07 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $10,599 $7,500 Not Implemented
LE0239 # 08 Y:2006 08 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $4,312 $2,528 Not Implemented
LE0239 # 09 Y:2006 09 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,132 $6,000 Not Implemented
LE0239 # 10 Y:2006 10 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $355 $500 Not Implemented
LE0226 # 01 Y:2006 01 2006 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $154,145 $75,000 Implemented
LE0226 # 02 Y:2006 02 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $109,146 $363,000 Not Implemented
LE0226 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $81,919 $51,275 Implemented
LE0226 # 04 Y:2006 04 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $64,647 $2,500 Not Implemented
LE0226 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $50,061 $47,500 Implemented
LE0226 # 06 Y:2006 06 2006 REPAIR AND ELIMINATE STEAM LEAKS $14,515 $800 Implemented
LE0226 # 07 Y:2006 07 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $8,946 $16,000 Not Implemented
LE0226 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $500 Implemented
OK0718 # 01 Y:2005 01 2005 DEVELOP A REPAIR/REPLACE POLICY $12,970 $500 Implemented
OK0718 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,021 $40,875 Not Implemented
OK0718 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $5,034 $459 Not Implemented
OK0718 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,239 $8,030 Not Implemented
OK0718 # 05 Y:2005 05 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,243 $5,175 Not Implemented
OK0718 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,343 $1,693 Implemented
OK0718 # 07 Y:2005 07 2005 USE OPTIMUM THICKNESS INSULATION $2,162 $1,710 Implemented
OK0718 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,226 $66,500 Implemented
OK0694 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,045,517 $1,029,484 Not Implemented
OK0694 # 02 Y:2004 02 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $60,059 $691 Not Implemented
OK0694 # 03 Y:2004 03 2004 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $9,026 $9,344 Not Implemented
OK0694 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $65,085 $407,420 Not Implemented