IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

413

matching recommendations
Reset
NAICS 32519 Other Basic Organic Chemical Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0718 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,021 $40,875 Not Implemented
OK0718 # 03 Y:2005 03 2005 USE COMPRESSOR AIR FILTERS $5,034 $459 Not Implemented
OK0718 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,239 $8,030 Not Implemented
OK0718 # 05 Y:2005 05 2005 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,243 $5,175 Not Implemented
OK0718 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $1,343 $1,693 Implemented
OK0718 # 07 Y:2005 07 2005 USE OPTIMUM THICKNESS INSULATION $2,162 $1,710 Implemented
OK0718 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,226 $66,500 Implemented
OK0694 # 01 Y:2004 01 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,045,517 $1,029,484 Not Implemented
OK0694 # 02 Y:2004 02 2004 BURN A LESS EXPENSIVE GRADE OF FUEL $60,059 $691 Not Implemented
OK0694 # 03 Y:2004 03 2004 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $9,026 $9,344 Not Implemented
OK0694 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $65,085 $407,420 Not Implemented
OK0694 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $2,247 $2,094 Implemented
OK0694 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,157 $2,968 Implemented
UM0254 # 01 Y:2004 01 2004 $31,255 $30,000 Not Implemented
UM0254 # 02 Y:2004 02 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,650 $2,200 Implemented
UM0254 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,907 $0 Implemented
UM0254 # 04 Y:2004 04 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $3,584 $15,000 Not Implemented
UM0254 # 05 Y:2004 05 2004 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,267 $10,000 Not Implemented
UM0254 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,010 $1,080 Implemented
UM0254 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,479 $1,038 Implemented
TA0058 # 01 Y:2003 01 2003 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $15,460 $0 Implemented
TA0058 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $400 Implemented
TA0058 # 03 Y:2003 03 2003 AIR CONDITION ONLY SPACE NECESSARY $2,500 $100 Implemented
TA0058 # 04 Y:2003 04 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,800 $0 Implemented
TA0058 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $335 $0 Implemented