Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
427
matching recommendationsNAICS | 32519 | Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0694 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $2,247 | $2,094 | Implemented |
OK0694 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,157 | $2,968 | Implemented |
UM0254 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $31,255 | $30,000 | Not Implemented |
UM0254 # 02 Y:2004 | 02 | 2004 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $9,650 | $2,200 | Implemented |
UM0254 # 03 Y:2004 | 03 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,907 | $0 | Implemented |
UM0254 # 04 Y:2004 | 04 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $3,584 | $15,000 | Not Implemented |
UM0254 # 05 Y:2004 | 05 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,267 | $10,000 | Not Implemented |
UM0254 # 06 Y:2004 | 06 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,010 | $1,080 | Implemented |
UM0254 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,479 | $1,038 | Implemented |
TA0058 # 01 Y:2003 | 01 | 2003 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $15,460 | $0 | Implemented |
TA0058 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,000 | $400 | Implemented |
TA0058 # 03 Y:2003 | 03 | 2003 | AIR CONDITION ONLY SPACE NECESSARY | $2,500 | $100 | Implemented |
TA0058 # 04 Y:2003 | 04 | 2003 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,800 | $0 | Implemented |
TA0058 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $335 | $0 | Implemented |
TA0058 # 06 Y:2003 | 06 | 2003 | INSTALL OCCUPANCY SENSORS | $190 | $123 | Not Implemented |
TA0058 # 07 Y:2003 | 07 | 2003 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $155 | $0 | Implemented |
TA0058 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $214 | $120 | Not Implemented |
IC0060 # 01 Y:2003 | 01 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $148,006 | $13,000 | Implemented |
IC0060 # 02 Y:2003 | 02 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,832 | $13,240 | Implemented |
IC0060 # 03 Y:2003 | 03 | 2003 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,390 | $20,640 | Implemented |
IC0060 # 04 Y:2003 | 04 | 2003 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $163,590 | $170,491 | Implemented |
IC0060 # 05 Y:2003 | 05 | 2003 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $92,294 | $190,000 | Not Implemented |
IC0060 # 06 Y:2003 | 06 | 2003 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,196 | $22,867 | Not Implemented |
IC0060 # 07 Y:2003 | 07 | 2003 | REPAIR AND ELIMINATE STEAM LEAKS | $11,372 | $5,850 | Implemented |
IC0060 # 08 Y:2003 | 08 | 2003 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,439 | $6,850 | Not Implemented |