Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
456
matching recommendationsNAICS | 32519 | Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1093 # 08 Y:2023 | 08 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,354 | $1,420 | Implemented |
OK1093 # 09 Y:2023 | 09 | 2023 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,201 | $632 | Not Implemented |
OK1093 # 10 Y:2023 | 10 | 2023 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $31,034 | $19,400 | Not Implemented |
OK1093 # 11 Y:2023 | 11 | 2023 | CHANGE METHOD OF DEIONIZED WATER PRODUCTION | $98,980 | $367,077 | Implemented |
OK1093 # 12 Y:2023 | 12 | 2023 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $150,722 | $300,000 | Implemented |
OK1093 # 13 Y:2023 | 13 | 2023 | MAKE A NEW BY-PRODUCT | $1,221,405 | $1,600,000 | Implemented |
UD1032 # 01 Y:2022 | 01 | 2022 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $58,668 | $25,875 | Not Implemented |
UD1032 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,757 | $0 | Not Implemented |
UD1032 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,018 | $10,000 | Not Implemented |
UD1032 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $68,929 | $100,000 | Implemented |
UD1032 # 05 Y:2022 | 05 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $14,725 | $4,661 | Not Implemented |
UD1032 # 06 Y:2022 | 06 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,104 | $0 | Implemented |
UD1032 # 07 Y:2022 | 07 | 2022 | INSTALL OCCUPANCY SENSORS | $19,725 | $23,544 | Not Implemented |
UD1032 # 08 Y:2022 | 08 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $351,582 | $1,000,000 | Not Implemented |
NL0056 # 01 Y:2021 | 01 | 2021 | OPERATE DISTILLATION COLUMNS EFFICIENTLY | $222,300 | $82,500 | Implemented |
NL0056 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,032 | $1,600 | Implemented |
NL0056 # 03 Y:2021 | 03 | 2021 | REPAIR AND ELIMINATE STEAM LEAKS | $8,331 | $4,500 | Not Implemented |
NL0056 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,013 | $11,549 | Implemented |
NL0056 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $1,169 | $770 | Implemented |
IP0121 # 08 Y:2019 | 08 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,512 | $9,313 | Not Implemented |
IP0121 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,409 | $5 | Not Implemented |
IP0121 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $662 | $23 | Implemented |
IP0121 # 03 Y:2019 | 03 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,721 | $260 | Implemented |
IP0121 # 04 Y:2019 | 04 | 2019 | OPTIMIZE PLANT POWER FACTOR | $2,859 | $3,200 | Not Implemented |
IP0121 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,800 | $4,725 | Implemented |