Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 32519 | Other Basic Organic Chemical Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0569 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,208 | $33,756 | Implemented |
NC0569 # 06 Y:2016 | 06 | 2016 | USE PHOTOCELL CONTROLS | $423 | $150 | Implemented |
NC0569 # 08 Y:2016 | 08 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,856 | $230 | Not Implemented |
NC0569 # 07 Y:2016 | 07 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $2,230 | $4,256 | Implemented |
NC0569 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,986 | $18,150 | Implemented |
NC0569 # 01 Y:2016 | 01 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $68,453 | $280,000 | Not Implemented |
NC0569 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $19,493 | $48,500 | Not Implemented |
NC0569 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,698 | $200 | Implemented |
NC0536 # 08 Y:2015 | 08 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $314 | $206 | Not Implemented |
NC0536 # 07 Y:2015 | 07 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,618 | $1,873 | Not Implemented |
NC0536 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,475 | $347 | Not Implemented |
NC0536 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,199 | $15,557 | Not Implemented |
NC0536 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,004 | $100 | Not Implemented |
NC0536 # 03 Y:2015 | 03 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,195 | $9,000 | Not Implemented |
NC0536 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,080 | $10,000 | Not Implemented |
NC0536 # 01 Y:2015 | 01 | 2015 | OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS | $88,496 | $300,000 | Not Implemented |
NC0536 # 09 Y:2015 | 09 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,508 | $351 | Not Implemented |
NC0383 # 10 Y:2008 | 10 | 2008 | DEVELOP A REPAIR/REPLACE POLICY | $11,700 | $11,589 | Implemented |
NC0383 # 09 Y:2008 | 09 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,623 | $100 | Implemented |
NC0383 # 08 Y:2008 | 08 | 2008 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,043 | $6,150 | Not Implemented |
NC0383 # 07 Y:2008 | 07 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,848 | $50 | Not Implemented |
NC0383 # 06 Y:2008 | 06 | 2008 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,245 | $20,000 | Not Implemented |
NC0383 # 05 Y:2008 | 05 | 2008 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $4,551 | $10,000 | Implemented |
NC0383 # 04 Y:2008 | 04 | 2008 | INCREASE AMOUNT OF CONDENSATE RETURNED | $19,037 | $30,000 | Not Implemented |
NC0383 # 02 Y:2008 | 02 | 2008 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $38,474 | $0 | Implemented |