IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 3252 Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0431 # 03 Y:2024 03 2024 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $2,111 $124,000 n/a
MS0431 # 02 Y:2024 02 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $57,233 $175,000 n/a
MS0431 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $60,065 $1,274,840 n/a
UA0096 # 05 Y:2013 05 2013 INSTALL TIMERS AND/OR THERMOSTATS $3,456 $1,320 Implemented
UA0096 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $485 $400 Not Implemented
UA0096 # 06 Y:2013 06 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $766 $8 Not Implemented
UA0096 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $1,997 $545 Implemented
UA0096 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $321 $1,000 Not Implemented
UA0096 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $817 $996 Implemented
UA0096 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,715 $39,573 Implemented
UA0096 # 01 Y:2013 01 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,079 $0 Implemented
MS0360 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,606 $18,481 Not Implemented
MS0360 # 02 Y:2010 02 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $91,795 $240,500 Implemented
MS0360 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $244,785 $930,000 Not Implemented
MS0362 # 01 Y:2010 01 2010 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $129,172 $586,857 Implemented
MS0366 # 01 Y:2010 01 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $30,120 $217,605 Not Implemented
MS0348 # 03 Y:2010 03 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $29,394 $103,215 Not Implemented
MS0348 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,319 $50,244 Not Implemented
MS0348 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $5,041 $300 Not Implemented
MS0348 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,658 $2,310 Not Implemented
MS0348 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,423 $378 Not Implemented
MS0348 # 02 Y:2010 02 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $30,120 $217,605 Not Implemented
MS0348 # 01 Y:2010 01 2010 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $112,791 $264,425 Not Implemented
LL0279 # 06 Y:2007 06 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,535 $30 Not Implemented
LL0279 # 05 Y:2007 05 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,945 $3,767 Not Implemented