Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0767 # 03 Y:2007 | 03 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $14,876 | $0 | Not Implemented |
UD0767 # 02 Y:2007 | 02 | 2007 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $20,419 | $17,235 | Not Implemented |
UD0767 # 01 Y:2007 | 01 | 2007 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $30,284 | $1,500 | Implemented |
UD0767 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,731 | $33,190 | Not Implemented |
UD0767 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,309 | $7,740 | Not Implemented |
UD0767 # 06 Y:2007 | 06 | 2007 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $2,922 | $5,000 | Not Implemented |
UD0767 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,625 | $2,175 | Implemented |
UD0767 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,139 | $5,050 | Not Implemented |
LE0264 # 02 Y:2007 | 02 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,103 | $2,500 | Implemented |
LE0264 # 11 Y:2007 | 11 | 2007 | INSTALL OCCUPANCY SENSORS | $3,069 | $750 | Not Implemented |
LE0264 # 10 Y:2007 | 10 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,288 | $1,000 | Implemented |
LE0264 # 09 Y:2007 | 09 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,674 | $5,000 | Not Implemented |
LE0264 # 08 Y:2007 | 08 | 2007 | USE SYNTHETIC LUBRICANT | $3,151 | $500 | Not Implemented |
LE0264 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,184 | $2,500 | Implemented |
LE0264 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,514 | $200 | Not Implemented |
LE0264 # 05 Y:2007 | 05 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,084 | $500 | Implemented |
LE0264 # 04 Y:2007 | 04 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,727 | $2,250 | Not Implemented |
LE0264 # 03 Y:2007 | 03 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $4,204 | $2,000 | Implemented |
LE0264 # 01 Y:2007 | 01 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $25,680 | $50,000 | Implemented |
OK0751 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,572 | $2,401 | Not Implemented |
OK0751 # 03 Y:2007 | 03 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,188 | $200 | Not Implemented |
OK0751 # 02 Y:2007 | 02 | 2007 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $59,692 | $201,700 | Not Implemented |
LL0279 # 06 Y:2007 | 06 | 2007 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,535 | $30 | Not Implemented |
LL0279 # 05 Y:2007 | 05 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,945 | $3,767 | Not Implemented |
LL0279 # 04 Y:2007 | 04 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,145 | $2,490 | Not Implemented |