matching recommendationsNAICS | 3252 | Resin, Synthetic Rubber, and Artificial Synthetic Fibers and Filaments Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0438 # 01 Y:2011 | 01 | 2011 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $62,448 | $94,000 | Not Implemented |
NC0438 # 02 Y:2011 | 02 | 2011 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,972 | $7,800 | Implemented |
NC0438 # 03 Y:2011 | 03 | 2011 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $19,068 | $32,000 | Not Implemented |
NC0438 # 04 Y:2011 | 04 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $19,936 | $5,500 | Not Implemented |
NC0438 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,224 | $300 | Implemented |
NC0438 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $1,416 | $2,112 | Implemented |
NC0438 # 05 Y:2011 | 05 | 2011 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $43,023 | $92,800 | Not Implemented |
NC0438 # 06 Y:2011 | 06 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $5,515 | $5,548 | Not Implemented |
IC0182 # 14 Y:2011 | 14 | 2011 | OPTIMIZE PLANT POWER FACTOR | $3,378 | $20,932 | Not Implemented |
IC0182 # 15 Y:2011 | 15 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $110 | $0 | Not Implemented |
IC0182 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75 | $116 | Not Implemented |
IC0182 # 13 Y:2011 | 13 | 2011 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $379 | $379 | Not Implemented |
IC0182 # 12 Y:2011 | 12 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,314 | $1,318 | Not Implemented |
IC0182 # 11 Y:2011 | 11 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,294 | $921 | Not Implemented |
IC0182 # 10 Y:2011 | 10 | 2011 | INSTALL AUTOMATIC STACK DAMPER | $5,217 | $50,324 | Not Implemented |
IC0182 # 09 Y:2011 | 09 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,442 | $311 | Not Implemented |
IC0182 # 08 Y:2011 | 08 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $950 | $311 | Not Implemented |
IC0182 # 07 Y:2011 | 07 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,314 | $5,489 | Not Implemented |
IC0182 # 06 Y:2011 | 06 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,070 | $0 | Not Implemented |
IC0182 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $2,734 | $11,001 | Not Implemented |
IC0182 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,045 | $43,859 | Not Implemented |
IC0182 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $273 | $0 | Not Implemented |
IC0182 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,306 | $672 | Not Implemented |
UM0386 # 04 Y:2011 | 04 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,885 | $18,495 | Not Implemented |
UM0386 # 05 Y:2011 | 05 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,336 | $2,471 | Implemented |