Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,034
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0171 # 06 Y:2016 | 06 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,076 | $431 | Not Implemented |
DL0171 # 07 Y:2016 | 07 | 2016 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,885 | $0 | Implemented |
DL0171 # 08 Y:2016 | 08 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,911 | $588 | Not Implemented |
DL0171 # 09 Y:2016 | 09 | 2016 | INSTALL AUTOMATIC STACK DAMPER | $624 | $205 | Not Implemented |
DL0171 # 10 Y:2016 | 10 | 2016 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,505 | $1,524 | Not Implemented |
DL0171 # 11 Y:2016 | 11 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,192 | $3,840 | Not Implemented |
DL0171 # 12 Y:2016 | 12 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,030 | $0 | Implemented |
DL0171 # 13 Y:2016 | 13 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $890 | $4,170 | Not Implemented |
AM0718 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $123,800 | $195,000 | Not Implemented |
AM0718 # 02 Y:2016 | 02 | 2016 | OPTIMIZE PLANT POWER FACTOR | $53,431 | $280,072 | Not Implemented |
AM0718 # 03 Y:2016 | 03 | 2016 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $65,900 | $400,000 | Not Implemented |
AM0718 # 04 Y:2016 | 04 | 2016 | USE SYNTHETIC LUBRICANT | $28,832 | $0 | Implemented |
AM0718 # 05 Y:2016 | 05 | 2016 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $10,555 | $1,800 | Not Implemented |
WV0535 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,812 | $8,931 | Not Implemented |
WV0535 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $4,153 | $511 | Implemented |
WV0535 # 03 Y:2016 | 03 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,206 | $1,000 | Implemented |
WV0535 # 04 Y:2016 | 04 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $2,918 | $4,500 | Not Implemented |
WV0535 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,030 | $6,200 | Not Implemented |
WV0535 # 06 Y:2016 | 06 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $1,538 | $578 | Implemented |
WV0535 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,622 | $2,120 | Implemented |
WV0535 # 08 Y:2016 | 08 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $691 | $30 | Implemented |
WV0535 # 09 Y:2016 | 09 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $320 | $298 | Implemented |
WV0535 # 10 Y:2016 | 10 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $260 | $138 | Implemented |
UM0471 # 01 Y:2016 | 01 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,290 | $500 | n/a |
UM0471 # 02 Y:2016 | 02 | 2016 | INSTALL OCCUPANCY SENSORS | $1,462 | $1,750 | n/a |