Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,034
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0471 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $696 | $2,500 | n/a |
UM0471 # 04 Y:2016 | 04 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,519 | $5,500 | n/a |
UM0471 # 05 Y:2016 | 05 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,664 | $3,435 | n/a |
SD0535 # 01 Y:2016 | 01 | 2016 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $324,317 | $112,783 | Implemented |
SD0535 # 02 Y:2016 | 02 | 2016 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $110,770 | $402,000 | Not Implemented |
SD0535 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,449 | $42,926 | Implemented |
SD0535 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $9,321 | $3,181 | Not Implemented |
SD0535 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $7,184 | $6,400 | Implemented |
SD0535 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,708 | $200 | Not Implemented |
SD0535 # 07 Y:2016 | 07 | 2016 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $710 | $3,100 | Not Implemented |
WM0088 # 01 Y:2016 | 01 | 2016 | OPTIMIZE PLANT POWER FACTOR | $71,275 | $132,797 | Not Implemented |
WM0088 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $75,376 | $50,000 | Not Implemented |
WM0088 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,940 | $28,000 | Not Implemented |
WM0088 # 04 Y:2016 | 04 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,075 | $501 | Not Implemented |
WM0088 # 05 Y:2016 | 05 | 2016 | METER WASTE WATER | $4,267 | $375 | Not Implemented |
WM0088 # 06 Y:2016 | 06 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,245 | $0 | Implemented |
WM0088 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,531 | $6,000 | Not Implemented |
SF0479 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $796 | $70 | Not Implemented |
SF0479 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,025 | $210 | Implemented |
SF0479 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,397 | $4,166 | Implemented |
SF0479 # 04 Y:2016 | 04 | 2016 | INSTALL OCCUPANCY SENSORS | $846 | $2,490 | Implemented |
SF0479 # 05 Y:2016 | 05 | 2016 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,263 | $204,396 | Not Implemented |
AM0701 # 01 Y:2016 | 01 | 2016 | REPAIR OR REPLACE STEAM TRAPS | $515,000 | $75,000 | Implemented |
AM0701 # 02 Y:2016 | 02 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $195,000 | $2,000 | Implemented |
AM0701 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $73,125 | $105,700 | Implemented |