Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,034
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WM0202 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,708 | $2,511 | Implemented |
WM0202 # 06 Y:2023 | 06 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $699 | $0 | Not Implemented |
KS2316 # 01 Y:2023 | 01 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $11,534 | $2,766 | Implemented |
KS2316 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,197 | $1,784 | Not Implemented |
KS2316 # 03 Y:2023 | 03 | 2023 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,228 | $2,463 | Not Implemented |
KS2316 # 04 Y:2023 | 04 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,417 | $0 | Not Implemented |
KS2316 # 05 Y:2023 | 05 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $125,127 | $627,000 | Not Implemented |
KS2316 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,198 | $29,442 | Not Implemented |
KS2316 # 07 Y:2023 | 07 | 2023 | INSTALL OCCUPANCY SENSORS | $7,751 | $6,350 | Not Implemented |
KS2316 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,336 | $29,920 | Implemented |
KS2316 # 09 Y:2023 | 09 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $49,691 | $246,356 | Implemented |
KS2316 # 10 Y:2023 | 10 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $17,892 | $156,412 | Implemented |
KS2316 # 11 Y:2023 | 11 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $52,146 | $422,182 | Not Implemented |
WV0643 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $4,345 | $8,691 | Implemented |
WV0643 # 02 Y:2023 | 02 | 2023 | MINIMIZE WATER USAGE | $4,332 | $20,664 | Not Implemented |
WV0643 # 03 Y:2023 | 03 | 2023 | INSTALL SET-BACK TIMERS | $3,513 | $1,125 | Implemented |
WV0643 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $1,534 | $2,013 | Implemented |
WV0643 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $966 | $3,959 | Implemented |
WV0643 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $829 | $2,567 | Implemented |
WV0643 # 07 Y:2023 | 07 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $693 | $671 | Implemented |
WV0643 # 08 Y:2023 | 08 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $603 | $1,520 | Implemented |
WV0643 # 09 Y:2023 | 09 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $418 | $100 | Implemented |
WV0643 # 10 Y:2023 | 10 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $73 | $215 | Implemented |
TT0285 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $65,659 | $129,000 | Not Implemented |
TT0285 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,051 | $12,000 | Not Implemented |