Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
148
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1096 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,210 | $242,106 | n/a |
UD1096 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $1,551 | $5,809 | n/a |
UD1096 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,767 | $6,096 | n/a |
UD1096 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $780 | $872 | n/a |
UD1096 # 03 Y:2024 | 03 | 2024 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $10,522 | $1,061 | n/a |
UD1096 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,966 | $0 | n/a |
UD1096 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $407 | $0 | n/a |
UD1063 # 01 Y:2023 | 01 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,244 | $297 | Not Implemented |
UD1063 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $170 | $200 | Not Implemented |
UD1063 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,201 | $2,583 | Not Implemented |
UD1063 # 04 Y:2023 | 04 | 2023 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $4,227 | $2,191 | Not Implemented |
UD1063 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $461 | $952 | Not Implemented |
UD1063 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $760 | $0 | Not Implemented |
UD1063 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $3,994 | $10,500 | Not Implemented |
UD1062 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $1,152 | $2,000 | Implemented |
UD1062 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $727 | $952 | Not Implemented |
UD1062 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,907 | $0 | Not Implemented |
UD1062 # 03 Y:2023 | 03 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $705 | $260 | Not Implemented |
UD1062 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $342 | $0 | Not Implemented |
UD1062 # 02 Y:2023 | 02 | 2023 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,486 | $0 | Not Implemented |
WV0574 # 03 Y:2019 | 03 | 2019 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $9,375 | $3,276 | Not Implemented |
WV0574 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,691 | $46 | Implemented |
WV0574 # 09 Y:2019 | 09 | 2019 | MINIMIZE WATER USAGE | $615 | $2,100 | Not Implemented |
WV0574 # 01 Y:2019 | 01 | 2019 | REVISE RAW MATERIAL SPECS | $26,910 | $52,500 | Not Implemented |
WV0574 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $14,108 | $10,162 | Implemented |