Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0438 # 01 Y:2011 | 01 | 2011 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $62,448 | $94,000 | Not Implemented |
NC0438 # 02 Y:2011 | 02 | 2011 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $8,972 | $7,800 | Implemented |
NC0438 # 03 Y:2011 | 03 | 2011 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $19,068 | $32,000 | Not Implemented |
NC0438 # 04 Y:2011 | 04 | 2011 | REPAIR OR REPLACE STEAM TRAPS | $19,936 | $5,500 | Not Implemented |
NC0438 # 07 Y:2011 | 07 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,224 | $300 | Implemented |
NC0438 # 08 Y:2011 | 08 | 2011 | INSTALL OCCUPANCY SENSORS | $1,416 | $2,112 | Implemented |
NC0438 # 05 Y:2011 | 05 | 2011 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $43,023 | $92,800 | Not Implemented |
NC0438 # 06 Y:2011 | 06 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $5,515 | $5,548 | Not Implemented |
IC0182 # 14 Y:2011 | 14 | 2011 | OPTIMIZE PLANT POWER FACTOR | $3,378 | $20,932 | Not Implemented |
IC0182 # 15 Y:2011 | 15 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $110 | $0 | Not Implemented |
IC0182 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $75 | $116 | Not Implemented |
IC0182 # 13 Y:2011 | 13 | 2011 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $379 | $379 | Not Implemented |
IC0182 # 12 Y:2011 | 12 | 2011 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,314 | $1,318 | Not Implemented |
IC0182 # 11 Y:2011 | 11 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,294 | $921 | Not Implemented |
IC0182 # 10 Y:2011 | 10 | 2011 | INSTALL AUTOMATIC STACK DAMPER | $5,217 | $50,324 | Not Implemented |
IC0182 # 09 Y:2011 | 09 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,442 | $311 | Not Implemented |
IC0182 # 08 Y:2011 | 08 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $950 | $311 | Not Implemented |
IC0182 # 07 Y:2011 | 07 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,314 | $5,489 | Not Implemented |
IC0182 # 06 Y:2011 | 06 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,070 | $0 | Not Implemented |
IC0182 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $2,734 | $11,001 | Not Implemented |
IC0182 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,045 | $43,859 | Not Implemented |
IC0182 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $273 | $0 | Not Implemented |
IC0182 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,306 | $672 | Not Implemented |
UM0386 # 04 Y:2011 | 04 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,885 | $18,495 | Not Implemented |
UM0386 # 05 Y:2011 | 05 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,336 | $2,471 | Implemented |