IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
NAICS 32521 Resin and Synthetic Rubber Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0706 # 01 Y:2018 01 2018 REPAIR AND ELIMINATE STEAM LEAKS $12,552 $1,970 Implemented
OR0706 # 02 Y:2018 02 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $15,952 $28,542 Not Implemented
OR0706 # 03 Y:2018 03 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,311 $2,097 Not Implemented
OR0706 # 04 Y:2018 04 2018 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $8,000 $24,775 Implemented
OR0706 # 05 Y:2018 05 2018 REDUCE FLUID FLOW RATES $1,821 $3,221 Not Implemented
OR0706 # 06 Y:2018 06 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $854 $0 Implemented
UF0520 # 06 Y:2018 06 2018 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $75,538 $33,400 Implemented
UF0520 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,084 $1,020 Implemented
UF0520 # 01 Y:2018 01 2018 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $219,545 $970,000 Not Implemented
UF0520 # 02 Y:2018 02 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $4,699 $15,000 Implemented
UF0520 # 03 Y:2018 03 2018 ISOLATE HOT OR COLD EQUIPMENT $5,366 $5,125 Not Implemented
UF0520 # 04 Y:2018 04 2018 OPTIMIZE PLANT POWER FACTOR $1,303 $2,207 Implemented
WM0121 # 04 Y:2018 04 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,055 $52,350 Not Implemented
WM0121 # 09 Y:2018 09 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,083 $4,115 Not Implemented
WM0121 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,568 $12,240 Implemented
WM0121 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $10,644 $10,926 Implemented
WM0121 # 07 Y:2018 07 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,876 $3,060 Not Implemented
WM0121 # 08 Y:2018 08 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,741 $7,920 Implemented
WM0121 # 12 Y:2018 12 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,095 $1,848 Implemented
WM0121 # 03 Y:2018 03 2018 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $25,239 $23,000 Not Implemented
WM0121 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,043 $20,000 Implemented
WM0121 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $34,154 $54,000 Not Implemented
WM0121 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,625 $2,330 Implemented
WM0121 # 11 Y:2018 11 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,374 $2,400 Not Implemented
WM0121 # 13 Y:2018 13 2018 USE PHOTOCELL CONTROLS $1,065 $1,843 Not Implemented