Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
410
matching recommendationsNAICS | 32521 | Resin and Synthetic Rubber Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2506 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,455 | $2,940 | n/a |
UL2506 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,323 | $17,116 | n/a |
UL2506 # 01 Y:2025 | 01 | 2025 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $77,396 | $40,000 | n/a |
UL2506 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $49,775 | $25,480 | n/a |
UL2506 # 03 Y:2025 | 03 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $43,343 | $86,469 | n/a |
UL2506 # 05 Y:2025 | 05 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $13,709 | $151,700 | n/a |
WV0682 # 10 Y:2025 | 10 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $5,033 | $8,967 | n/a |
WV0682 # 11 Y:2025 | 11 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,702 | $378 | n/a |
WV0682 # 13 Y:2025 | 13 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $4,273 | $13,665 | n/a |
WV0682 # 15 Y:2025 | 15 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,069 | $1,258 | n/a |
WV0682 # 01 Y:2025 | 01 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,686 | $61,240 | n/a |
WV0682 # 02 Y:2025 | 02 | 2025 | MINIMIZE WATER USAGE | $71,374 | $60,060 | n/a |
WV0682 # 07 Y:2025 | 07 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $7,508 | $5,220 | n/a |
WV0682 # 14 Y:2025 | 14 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,661 | $900 | n/a |
WV0682 # 05 Y:2025 | 05 | 2025 | INSULATE BARE EQUIPMENT | $17,044 | $488 | n/a |
WV0682 # 08 Y:2025 | 08 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $7,131 | $13,250 | n/a |
WV0682 # 12 Y:2025 | 12 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,346 | $11,060 | n/a |
WV0682 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $13,054 | $14,058 | n/a |
WV0682 # 04 Y:2025 | 04 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $17,883 | $6,000 | n/a |
WV0682 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,561 | $12,599 | n/a |
WV0682 # 09 Y:2025 | 09 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,955 | $3,160 | n/a |
UF0628 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,801 | $322,608 | n/a |
UF0628 # 08 Y:2025 | 08 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $2,783 | $6,000 | n/a |
UF0628 # 09 Y:2025 | 09 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,115 | $1,235 | n/a |
UF0628 # 10 Y:2025 | 10 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $514 | $1,235 | n/a |