Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
945
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0182 # 13 Y:2011 | 13 | 2011 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $379 | $379 | Not Implemented |
IC0182 # 14 Y:2011 | 14 | 2011 | OPTIMIZE PLANT POWER FACTOR | $3,378 | $20,932 | Not Implemented |
IC0182 # 15 Y:2011 | 15 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $110 | $0 | Not Implemented |
UM0386 # 01 Y:2011 | 01 | 2011 | INSTALL OCCUPANCY SENSORS | $3,851 | $2,100 | Not Implemented |
UM0386 # 02 Y:2011 | 02 | 2011 | UPGRADE CONTROLS ON COMPRESSORS | $2,043 | $3,615 | Implemented |
UM0386 # 03 Y:2011 | 03 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,167 | $1,000 | Implemented |
UM0386 # 04 Y:2011 | 04 | 2011 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,885 | $18,495 | Not Implemented |
UM0386 # 05 Y:2011 | 05 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,336 | $2,471 | Implemented |
UM0386 # 06 Y:2011 | 06 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,285 | $1,000 | Not Implemented |
UM0386 # 07 Y:2011 | 07 | 2011 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $982 | $10 | Not Implemented |
UM0386 # 08 Y:2011 | 08 | 2011 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $16,332 | $92,500 | Not Implemented |
WV0422 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,044 | $18,250 | Not Implemented |
WV0422 # 02 Y:2011 | 02 | 2011 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $9,494 | $17,598 | Not Implemented |
WV0422 # 03 Y:2011 | 03 | 2011 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,167 | $1,000 | Implemented |
WV0422 # 04 Y:2011 | 04 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,049 | $2,000 | Implemented |
WV0422 # 05 Y:2011 | 05 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $2,822 | $1,150 | Implemented |
WV0422 # 06 Y:2011 | 06 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,969 | $920 | Not Implemented |
WV0422 # 07 Y:2011 | 07 | 2011 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,500 | $2,875 | Not Implemented |
WV0422 # 08 Y:2011 | 08 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,008 | $50 | Implemented |
WV0422 # 09 Y:2011 | 09 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $954 | $363 | Implemented |
WV0422 # 10 Y:2011 | 10 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $750 | $329 | Not Implemented |
AM0587 # 01 Y:2010 | 01 | 2010 | REPAIR AND ELIMINATE STEAM LEAKS | $8,000 | $5,000 | Implemented |
AM0587 # 02 Y:2010 | 02 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,460 | $21,600 | Implemented |
AM0587 # 03 Y:2010 | 03 | 2010 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,760 | $1,030 | Implemented |
AM0587 # 04 Y:2010 | 04 | 2010 | OPTIMIZE PLANT POWER FACTOR | $5,087 | $21,130 | Not Implemented |