Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
945
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0264 # 09 Y:2007 | 09 | 2007 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,674 | $5,000 | Not Implemented |
LE0264 # 10 Y:2007 | 10 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,288 | $1,000 | Implemented |
LE0264 # 11 Y:2007 | 11 | 2007 | INSTALL OCCUPANCY SENSORS | $3,069 | $750 | Not Implemented |
UD0755 # 01 Y:2007 | 01 | 2007 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $73,500 | $147,000 | Implemented |
UD0755 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $57,728 | $10,396 | Implemented |
UD0755 # 03 Y:2007 | 03 | 2007 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $49,140 | $253,091 | Not Implemented |
UD0755 # 04 Y:2007 | 04 | 2007 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $46,585 | $42,000 | Not Implemented |
UD0755 # 05 Y:2007 | 05 | 2007 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $33,617 | $337,437 | Not Implemented |
UD0755 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,952 | $19,500 | Implemented |
UD0755 # 07 Y:2007 | 07 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $12,600 | $15,000 | Implemented |
UD0755 # 08 Y:2007 | 08 | 2007 | USE POWER DURING OFF-PEAK PERIODS | $12,404 | $0 | Not Implemented |
UD0755 # 09 Y:2007 | 09 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,340 | $2,000 | Implemented |
UD0755 # 10 Y:2007 | 10 | 2007 | USE OPTIMUM THICKNESS INSULATION | $4,545 | $16,005 | Not Implemented |
UD0755 # 11 Y:2007 | 11 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $2,520 | $0 | Not Implemented |
UD0755 # 12 Y:2007 | 12 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,928 | $42,500 | Implemented |
GT0833 # 01 Y:2006 | 01 | 2006 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $870,069 | $100,000 | Not Implemented |
GT0833 # 02 Y:2006 | 02 | 2006 | ELIMINATE/REDUCE AN OPERATION | $137,445 | $0 | Not Implemented |
GT0833 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,153 | $0 | Not Implemented |
GT0833 # 04 Y:2006 | 04 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,806 | $18,000 | Not Implemented |
GT0833 # 05 Y:2006 | 05 | 2006 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $29,400 | $0 | Implemented |
GT0833 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,653 | $550 | Not Implemented |
GT0833 # 07 Y:2006 | 07 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $6,204 | $0 | Implemented |
GT0833 # 08 Y:2006 | 08 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $36,891 | $62,250 | Not Implemented |
OK0739 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,798 | $9,750 | Implemented |
OK0739 # 02 Y:2006 | 02 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $156,872 | $2,175,000 | Not Implemented |