IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

945

matching recommendations
Reset
NAICS 325211 Plastics Material and Resin Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0264 # 09 Y:2007 09 2007 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $2,674 $5,000 Not Implemented
LE0264 # 10 Y:2007 10 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $1,000 Implemented
LE0264 # 11 Y:2007 11 2007 INSTALL OCCUPANCY SENSORS $3,069 $750 Not Implemented
UD0755 # 01 Y:2007 01 2007 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $73,500 $147,000 Implemented
UD0755 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57,728 $10,396 Implemented
UD0755 # 03 Y:2007 03 2007 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $49,140 $253,091 Not Implemented
UD0755 # 04 Y:2007 04 2007 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $46,585 $42,000 Not Implemented
UD0755 # 05 Y:2007 05 2007 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $33,617 $337,437 Not Implemented
UD0755 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,952 $19,500 Implemented
UD0755 # 07 Y:2007 07 2007 UPGRADE CONTROLS ON COMPRESSORS $12,600 $15,000 Implemented
UD0755 # 08 Y:2007 08 2007 USE POWER DURING OFF-PEAK PERIODS $12,404 $0 Not Implemented
UD0755 # 09 Y:2007 09 2007 RECOVER WASTE HEAT FROM EQUIPMENT $11,340 $2,000 Implemented
UD0755 # 10 Y:2007 10 2007 USE OPTIMUM THICKNESS INSULATION $4,545 $16,005 Not Implemented
UD0755 # 11 Y:2007 11 2007 UPGRADE CONTROLS ON COMPRESSORS $2,520 $0 Not Implemented
UD0755 # 12 Y:2007 12 2007 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,928 $42,500 Implemented
GT0833 # 01 Y:2006 01 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $870,069 $100,000 Not Implemented
GT0833 # 02 Y:2006 02 2006 ELIMINATE/REDUCE AN OPERATION $137,445 $0 Not Implemented
GT0833 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,153 $0 Not Implemented
GT0833 # 04 Y:2006 04 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,806 $18,000 Not Implemented
GT0833 # 05 Y:2006 05 2006 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $29,400 $0 Implemented
GT0833 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,653 $550 Not Implemented
GT0833 # 07 Y:2006 07 2006 PAY BILLS ON TIME TO AVOID LATE FEES $6,204 $0 Implemented
GT0833 # 08 Y:2006 08 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $36,891 $62,250 Not Implemented
OK0739 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,798 $9,750 Implemented
OK0739 # 02 Y:2006 02 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $156,872 $2,175,000 Not Implemented