IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 325211 Plastics Material and Resin Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0593 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,483 $0 Implemented
SD0593 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,043 $24,602 Not Implemented
SD0593 # 01 Y:2020 01 2020 INSTALL OCCUPANCY SENSORS $32,448 $3,843 Not Implemented
SD0535 # 07 Y:2016 07 2016 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $710 $3,100 Not Implemented
SD0535 # 01 Y:2016 01 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $324,317 $112,783 Implemented
SD0535 # 02 Y:2016 02 2016 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $110,770 $402,000 Not Implemented
SD0535 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,449 $42,926 Implemented
SD0535 # 04 Y:2016 04 2016 OPTIMIZE PLANT POWER FACTOR $9,321 $3,181 Not Implemented
SD0535 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $7,184 $6,400 Implemented
SD0535 # 06 Y:2016 06 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,708 $200 Not Implemented
SF0479 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $796 $70 Not Implemented
SF0479 # 05 Y:2016 05 2016 USE SOLAR HEAT TO MAKE ELECTRICTY $24,263 $204,396 Not Implemented
SF0479 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $210 Implemented
SF0479 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,397 $4,166 Implemented
SF0479 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $846 $2,490 Implemented
SD0497 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $953 $1,745 Not Implemented
SD0497 # 08 Y:2015 08 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,817 $12,575 Not Implemented
SD0497 # 07 Y:2015 07 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,323 $1,580 Not Implemented
SD0497 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,238 $10,050 Not Implemented
SD0497 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,591 $14,085 Not Implemented
SD0497 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,837 $1,500 Not Implemented
SD0497 # 03 Y:2015 03 2015 INSTALL TIMERS AND/OR THERMOSTATS $15,039 $2,275 Not Implemented
SD0497 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,403 $14,111 Not Implemented
SD0497 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $118,874 $425,000 Not Implemented
SF0284 # 04 Y:2004 04 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,933 $12,763 Implemented