Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 325211 | Plastics Material and Resin Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0332 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $58,961 | $200,000 | Implemented |
MZ0332 # 07 Y:2022 | 07 | 2022 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $5,524 | $7,544 | Not Implemented |
MZ0332 # 06 Y:2022 | 06 | 2022 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,198 | $720 | Not Implemented |
MZ0332 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $506 | $780 | Not Implemented |
MZ0332 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,676 | $1,330 | Implemented |
MZ0332 # 03 Y:2022 | 03 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,554 | $7,980 | Not Implemented |
MZ0332 # 02 Y:2022 | 02 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $87,851 | $670,334 | Not Implemented |
MZ0332 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,571 | $18,580 | Implemented |
MZ0159 # 02 Y:2014 | 02 | 2014 | INSULATE BARE EQUIPMENT | $428 | $1,200 | Implemented |
MZ0159 # 06 Y:2014 | 06 | 2014 | USE PHOTOCELL CONTROLS | $5,170 | $1,000 | Not Implemented |
MZ0159 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,788 | $23,000 | Implemented |
MZ0159 # 04 Y:2014 | 04 | 2014 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,895 | $37,500 | Implemented |
MZ0159 # 03 Y:2014 | 03 | 2014 | INSULATE BARE EQUIPMENT | $1,973 | $1,599 | Implemented |
MZ0159 # 01 Y:2014 | 01 | 2014 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $51,046 | $118,500 | Not Implemented |
MZ0047 # 01 Y:2010 | 01 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,104 | $3,000 | Implemented |
MZ0047 # 11 Y:2010 | 11 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,718 | $0 | Implemented |
MZ0047 # 10 Y:2010 | 10 | 2010 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $3,994 | $0 | Implemented |
MZ0047 # 09 Y:2010 | 09 | 2010 | INSTALL OCCUPANCY SENSORS | $6,528 | $760 | Implemented |
MZ0047 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $225 | $360 | Implemented |
MZ0047 # 07 Y:2010 | 07 | 2010 | INSULATE BARE EQUIPMENT | $785 | $400 | Implemented |
MZ0047 # 06 Y:2010 | 06 | 2010 | INSULATE BARE EQUIPMENT | $929 | $2,160 | Implemented |
MZ0047 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $65 | $180 | Implemented |
MZ0047 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,818 | $20,818 | Implemented |
MZ0047 # 03 Y:2010 | 03 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,857 | $80,000 | Not Implemented |
MZ0047 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,170 | $1,300 | Implemented |